DDA Structural Strengthening Approval in Dubai

Strengthening or repairing a slab, beam, column or foundation in a DDA area needs a DDA approval before the works start. We assess the structure, design the strengthening, coordinate the strengthening specialist stamp and submit it to DDA.

DDA handles strengthening and repair of completed buildings through its Building Modification service: the consultant submits the design with the structural calculations and models, the strengthening design carries a separate strengthening specialist stamp, and the contractor needs the DDA No Objection before starting structural works. We design the strengthening and a specialist contractor carries it out.

DDA serviceBuilding Modification
Extra stampStrengthening specialist
WorksSpecialist contractor

Route

The DDA strengthening route

Works on completed buildings in DDA areas.

StepWho
Developer, master community or building NOCEmaar, DAMAC, Dubai Holding or the building management, depending on the location
Building Modification designDDA, submitted by the consultant
Strengthening specialist stampOn the strengthening design, coordinated by us; see strengthening specialist stamp
DDA No Objection for the contractorBefore the structural works start
Works and site supervisionSpecialist contractor, supervised by the consultant
Inspection and close-outDDA

Methods

Strengthening methods we design

The specialist contractor applies them; we design and supervise.

MethodTypical use
Carbon fibre (CFRP) sheets and laminatesSlabs and beams for extra load, columns for confinement; see CFRP strengthening
Steel plate bonding and steel jacketingBeams, columns and openings
Concrete jacketingColumns and beams that need more section
Underpinning and micro-pilesFoundations under new or higher loads
Concrete repairSpalling, corroded steel and cracks; see DDA concrete repair

Triggers

When owners need strengthening

SituationGuide
New lift, stair or void in a slabStrengthening for new openings
Change of use or heavier equipmentAssessment before change of use
Cracks, spalling or corrosionStructural crack assessment
Post-tensioned slab cut or openedCut tendon repair
Tower in Business BayBusiness Bay strengthening

By element

Strengthening and restoration by element

Each element has its own page for strengthening and for restoration.

Stamps and review

Stamps, review and DDA comments

TopicGuide
Strengthening specialist stampstrengthening specialist stamp
Concrete and strengthening specialist stampconcrete and strengthening specialist stamp
Concrete restoration stampconcrete restoration stamp
Design by others: review and stampStrengthening design review
DDA comments on your fileDDA comments on a strengthening submission
Steel worksSteel specialist stamp for DDA

Official sites: DDA | Dubai Building Code

What you need to know

  • Assessment first: survey and tests before any design.
  • Separate stamp: DDA asks for a strengthening specialist stamp.
  • No Objection: the contractor waits for DDA before structural works.
  • Supervision: the consultant follows the works on site.

Documents you will need

  • Title deed or lease
  • As-built structural drawings, if available
  • Developer or building NOC requirements
  • Photos of the problem area
  • Any test results already done

How it works

How we take a strengthening project through DDA

1. Site visit

What and why.

2. Tests

By a testing lab.

3. Design

Strengthening or repair.

4. Stamps

Consultant and specialist.

5. DDA

Submission and comments.

6. Works

Supervised to close-out.

Already done

Strengthening already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

DDA strengthening questions

Do I need DDA approval to strengthen a slab or beam?

Yes. Structural works on a completed building in a DDA area go through the Building Modification service before the works start.

Who signs the strengthening design?

The consultant submits it to DDA, and the strengthening design also carries a separate strengthening specialist stamp. See who can stamp a strengthening design.

Can the contractor start once the design is ready?

No. DDA says the contractor needs the DDA No Objection to proceed with structural works.

Is CFRP accepted by DDA?

CFRP is a common strengthening method. It is designed and submitted like any other strengthening design. See CFRP strengthening.

Do you do the strengthening works?

No. We design and supervise; a specialist contractor carries out the works.

How long does it take?

It depends on the case and on the DDA comments. We give you a plan once we have seen the structure.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.