DDA · Column restoration · Updated November 2026

Column Restoration and Repair Approval (DDA)

Columns in car parks, basements and near the sea suffer from spalling, rusted steel bars and impact damage. Column repairs need propping and a repair design, and in DDA areas the repair goes to DDA with the specialist stamp.

Column damage usually starts at the base, where water and salts sit, or inside, where rusting bars split the cover. Columns carry the floors above, so the repair is propped and sequenced, and the repair design goes to DDA with the concrete restoration stamp.

TypicalBasement and car park columns
StampConcrete restoration
TestsBy a laboratory

Damage

Common column damage

Basement and car park columns, columns near the sea and columns hit by vehicles.

DamageCause or sign
Spalling at the baseWater and salts at floor level
Rusted vertical barsSection loss along the bars
Vehicle impactCar parks and loading areas
Cracks along the barsCorrosion starting inside

Investigation

What we investigate

A testing laboratory carries out the tests; our engineers choose the tests and read the results.

CheckHow
Cover depthCover meter scan
Concrete strengthCores, by a laboratory
ChloridesNear the sea and in car parks
Load during repairPropping design

Repair

How a column repair is designed

The DDA route is on the concrete restoration stamp page.

PartNotes
ProppingLoads taken off the column before breaking out
Steel bar treatment or added barsWhere section is lost
Concrete repairRepair mortar or concrete
ProtectionAgainst water and impact

Official sites: DDA | Dubai Building Code

What you need to know

  • Cause first: water and salts at floor level.
  • Restoration stamp on the repair design.
  • Supervised repair works.
  • Needs more strength? See column strengthening.

Documents you will need

  • Photos of the column damage
  • Building details
  • Earlier reports, if any

How it works

Column repair, step by step

1. Survey

Cover depth.

2. Tests

Laboratory.

3. Design

Repair and method.

4. DDA

Stamp and approval.

5. Repair

Supervised.

Questions

Column restoration questions

Do I need DDA approval to repair a column?

Structural repairs do. We check your case and tell you if the repair is structural.

Does a damaged column need propping before repair?

Usually yes. We design the propping with the repair.

Is the restoration stamp different from the strengthening stamp?

It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.

Related guides

Keep reading