DEWA approval for building works, done right.
DEWA approvals that come with building works: solar panel connections, electrical load changes and meter changes. We prepare the engineering and coordinate DEWA with the developer NOC and building permit.
DEWA approval
DEWA approves electricity and water connections. With building works, the common cases are solar panels on a villa roof, a higher electrical load for a restaurant or fit-out, and meter changes when two apartments are merged. The structural and building approvals for the works still come from the developer and the area authority.
Read the DEWA approval types guide →
What is DEWA approval?
- What it covers: Electricity and water connections, loads and meters.
- With building works: Solar panel connections, electrical load increases and meter changes.
- Alongside: The developer NOC and the building approval for the area.
Documents you will need
- Title deed or tenancy contract
- Developer NOC
- Roof or structure check for solar
- Existing load or meter details
When DEWA is involved
Projects that need DEWA
DEWA works alongside the developer NOC and the building authority for the area.
| Project | Approval route | Guides |
|---|---|---|
| Solar panels on a villa roof Villas | Roof structure check, developer NOC, then DEWA approval for the connection. | Solar approvals Solar sign-off |
| Restaurant or fit-out load increase Commercial units | DEWA approval for the extra electrical load. | Restaurant load increase |
| Merging two apartments Apartments | Meter changes arranged with DEWA after the merge approvals. | Apartment merging |
How it works
Six steps for works with DEWA
Review your project
What is changing and which approvals it needs.
Engineering
Roof or structure check and drawings where needed.
Developer NOC
The developer or building management NOC for the works.
Building approval
DM, DDA or Trakhees where the works need a permit.
DEWA approval
The DEWA application for the connection, load or meter change.
Completion
Inspections and sign-off of the works.
Works together with
Approvals that go with DEWA
Structural calculations
Roof and structure checks for solar frames and new loads.
Structural calculations →DCD alongside the permit
Where fire safety changes, Dubai Civil Defence approves the works and inspects them before completion.
DCD approvals →Common reasons DEWA applications get held up
- Missing developer NOC
- Roof structure not checked for solar frames
- Details that do not match the building approval
- Incomplete owner or tenant documents
Need DEWA approval?
Get your route today
Send us three things on WhatsApp:
- Your area or building, and the unit or plot number
- Photos of the area
- What you want to build or change
We confirm the route and handle the NOC, the approvals and the completion.
Power supply
New connections, connection NOC and load increases
Questions
DEWA approval FAQs
What is DEWA approval?
Electricity and water connections, loads and meters. Solar panel connections, electrical load increases and meter changes. The developer NOC and the building approval for the area.
Do solar panels need DEWA approval?
Yes. DEWA approves the solar connection, after the roof structure check and the developer NOC.
Does a restaurant need DEWA approval for more load?
Where the kitchen or fit-out needs more electrical load, DEWA approves the load increase.
What happens with DEWA when I merge two apartments?
Meter changes are arranged with DEWA as part of the merge.
Does DEWA replace the building permit?
No. DEWA approves the electricity side; the building works are approved by the developer and the area authority.
What are the types of DEWA approval?
Load, MEP drawing, connection and meter, and solar connection approvals.
Do solar panels need DEWA approval?
Yes, after the roof check and the developer NOC.
Do I need DEWA approval for more load?
Yes, for restaurants, fit-outs and extensions that need more power.
Does DEWA approval replace the building permit?
No, the permit still comes from DM, DDA or Trakhees.
Who submits to DEWA?
A DEWA-registered consultant or contractor; we coordinate it.
What happens to meters when apartments are merged?
Meter changes are arranged with DEWA after the merge approvals.
What happens after the works?
DEWA inspects and connects.
How do I get a DEWA new connection?
We calculate the electrical load, prepare the drawings and load schedule, and submit them to DEWA for you.
What is the DEWA connection NOC?
DEWA’s NOC for a new power supply to a villa, building or plot.
Do I need a DEWA load increase for a villa extension?
If the extension or new equipment raises the load beyond the existing supply, yes.
Related guides