Foundation Restoration and Repair Approval (DDA)
Foundations suffer from groundwater, salts and settlement, and the damage often shows as cracks in the walls above. Foundation repairs need a repair design and, in DDA areas, DDA approval with the specialist stamp.
Foundation problems usually show in the walls above: diagonal cracks, sticking doors and uneven floors. We investigate with trial pits and tests, design the repair and take it to DDA with the concrete restoration stamp.
Damage
Common foundation damage
Villas with wall cracks, buildings next to new excavations and plots with drainage problems.
| Damage | Cause or sign |
|---|---|
| Cracks in walls above | Possible settlement |
| Salt and water attack | Concrete and steel condition |
| Exposed footings | During works next door |
| Damage after leaks | Soil washed out |
Investigation
What we investigate
A testing laboratory carries out the tests; our engineers choose the tests and read the results.
| Check | How |
|---|---|
| Trial pits | Footing size and condition |
| Wall cracks | Pattern shows the movement |
| Leaks and drainage | Water washing out soil |
| Concrete condition | By a laboratory |
Repair
How a foundation repair is designed
The DDA route is on the concrete restoration stamp page.
| Part | Notes |
|---|---|
| Investigation | Trial pits and tests |
| Concrete repair | Repair mortar or concrete |
| Underpinning if needed | Where support is lost |
| Drainage fixes | Remove the cause |
Official sites: DDA | Dubai Building Code
What you need to know
- Cause first: possible settlement.
- Restoration stamp on the repair design.
- Supervised repair works.
- Needs more strength? See foundation strengthening.
Documents you will need
- Photos of the foundation damage
- Building details
- Earlier reports, if any
How it works
Foundation repair, step by step
1. Survey
Trial pits.
2. Tests
Laboratory.
3. Design
Repair and method.
4. DDA
Stamp and approval.
5. Repair
Supervised.
Questions
Foundation restoration questions
Do I need DDA approval to repair a foundation?
Structural repairs do. We check your case and tell you if the repair is structural.
My neighbour's works cracked my wall. What now?
We assess and report, and recommend a contractor for the repair. See shared wall cracks.
Is the restoration stamp different from the strengthening stamp?
It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.
Related guides
