Strengthening and Concrete Repair Design Review for DDA

You already have a strengthening or repair design, from a contractor, a supplier or another engineer, and it needs to go to DDA. We review it, revise it where needed, coordinate the specialist stamp and submit it.

A design prepared by others can go to DDA once it is checked against the existing structure and the codes. We review the drawings and calculations, visit the site, mark up what must change, coordinate the strengthening specialist stamp and submit the Building Modification as the consultant.

You haveA design already
We doReview, revise, stamp, submit
ForOwners and contractors

What we check

What the review covers

CheckWhy
Existing structure and loadsThe design must match what is built
CalculationsCapacity before and after
Method and detailsBuildable and safe to install
Material dataMatches the design assumptions
Fire and durabilityProtection where needed

Who sends us designs

Who we review for

WhoTypical case
CFRP applicatorsTheir system design needs the stamp and a consultant submission
Repair contractorsRepair method and details for DDA
OwnersA second opinion on a contractor's design; see second opinion
ConsultantsPeer review; see structural peer review

Official sites: DDA | Dubai Building Code

What you need to know

  • We revise where the design needs it.
  • Site visit before we sign anything.
  • Specialist stamp coordinated after the review.
  • Same route to DDA as our own designs.

Documents you will need

  • The design drawings
  • Calculations
  • Material or system data
  • Photos of the site

How it works

How the review works

1. Send the design

Drawings and calcs.

2. Review

Mark-ups.

3. Site visit

Matches the site?

4. Revise

Agreed changes.

5. Stamp

Specialist.

6. Submit

DDA.

Questions

Design review questions

Can you stamp a contractor's strengthening design?

After we review it and it meets the codes and the site. We revise what needs changing first.

Will you change the method?

Only where the review shows it is needed, and we agree it with you.

Is the stamp the same for repair designs?

It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.