Building Condition Survey in Dubai: Structural Inspection and Report
Cracks, spalling, leaks or an old building: find out what is going on.
A building condition survey is a structural inspection of a villa, building or warehouse. Our engineers inspect the structure, record cracks, spalling concrete, rusting steel, leaks and movement, arrange tests where needed and issue a report with the condition, the likely causes and the repairs.

Official sources: Dubai Municipality
What we check
- Cracks: Type, width and pattern
- Concrete: Spalling and rusting steel
- Water: Leaks and damp
- Structure: Slabs, beams, columns
- Tests: Where needed
- Report: Findings and repairs
Documents you will need
- Photos of the damage or concerns
- Building or villa location and age
- As-built drawings, if available
- Any earlier reports or repairs
Route
How it works, step by step
Who does what, from the first check to completion.
| Step | Approval route | Guides |
|---|---|---|
| Site visit Our engineers | Visual inspection of the structure and finishes, with photos. | — |
| Testing Testing laboratory, where needed | Concrete strength, cover, carbonation or chlorides. | — |
| Analysis Our engineers | Findings compared with the drawings and the loads. | — |
| Report Structural Solutions | Condition, causes and repair recommendations. | — |
| Repairs Your contractor | To our repair design, where needed. | — |
How it works
How we work
1. Send photos
Cracks, damage or concerns.
2. Visit
Inspection on site.
3. Tests
Only where needed.
4. Analysis
Causes and risks.
5. Report
Findings and repairs.
6. Repair design
If needed.
Related questions
What causes problems
- Painting over cracks without finding the cause
- Repairing concrete without treating the steel
- No tests where the survey needs them
Worried about cracks or damage?
Get the structure checked
Send us three things on WhatsApp:
- Photos of the problem
- Property type and location
- Age of the building, if known
Our engineers inspect, test where needed and give you a clear report with repairs.
Questions
Questions
What does the survey cover?
The structure: slabs, beams, columns, walls, foundations where visible.
Are tests always needed?
No, only where the inspection needs them.
Do you design the repairs?
Yes, where repairs are needed.
Villas and buildings?
Yes, and warehouses.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
