Strengthening for New Openings in Slabs: Lift, Stair and Void

Cutting a new opening in a slab for a lift, a stair, a void or a shaft removes concrete and often steel bars or tendons. We design the opening and the strengthening around it, and take it through the authority before any cutting.

A new slab opening needs a structural design: the opening size, the trimming beams or strengthening around it, the propping during cutting and, for post-tensioned slabs, a tendon scan first. In DDA areas the design goes through the Building Modification route with the strengthening specialist stamp; in other areas through DM or Trakhees.

Before cuttingDesign and approval
PT slabsTendon scan first
Around the holeStrengthening designed

Opening types

Common slab openings

OpeningGuide
Villa liftRetrofitting a lift into a villa
New internal stairTrimming beams and supports
Double-height voidSlab edge and supports
Service shaftSmall openings near columns need care
Post-tensioned slabPT slab opening assessment

By authority

Who approves

AreaRoute
DDA areasBuilding Modification and strengthening specialist stamp; see DDA strengthening approval
Dubai Municipality areasDM, through the approved consultant
Trakhees areasTrakhees, through the approved consultant
Wall openingsSee wall opening DDA permit

Official sites: DDA | Dubai Municipality | Trakhees | Dubai Building Code

What you need to know

  • Never cut first: design and approval before cutting.
  • Tendons in PT slabs must be located first.
  • Propping during the works.
  • Developer NOC in communities.

Documents you will need

  • As-built structural drawings, if available
  • Opening size and location
  • Lift or stair supplier data
  • Developer or building NOC requirements

How it works

How we handle a new slab opening

1. Site check

Slab type and supports.

2. Scan

Bars or tendons.

3. Design

Opening and strengthening.

4. Approval

DDA, DM or Trakhees.

5. Cutting

Propped and supervised.

Questions

Slab opening questions

Can I cut a hole in my slab for a lift?

Only with a structural design and the approval for your area. The slab around the opening usually needs strengthening.

What if the slab is post-tensioned?

The tendons are located first. Cutting a tendon needs its own design; see cut tendon repair.

What strengthening is used around openings?

Steel trimming beams, CFRP or concrete, depending on the slab. We design the option that suits your case.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.