DDA Concrete Repair and Restoration Approval
Spalling concrete, corroded steel bars and cracks in slabs, beams, columns or balconies need a repair design, and structural repairs in a DDA area need DDA approval before the works start.
Structural concrete repair in a DDA area follows the Building Modification route: we inspect, the testing lab tests the concrete, we design the repair and the method statement, the specialist stamp is coordinated, and the contractor starts after the DDA No Objection. Cosmetic patching with no structural effect is assessed case by case.
Problems
Common concrete problems
| Problem | What we check |
|---|---|
| Spalling | Depth, cause and the steel behind it |
| Corroded steel bars | Section loss and spread; see corrosion near the sea |
| Cracks in slabs and beams | Pattern, width and cause; see crack assessment |
| Water damage in podiums and basements | Concrete and steel condition |
| Balcony slabs | Edge condition and steel |
Repair or strengthen
Repair or strengthening?
| Repair | Strengthening |
|---|---|
| Restores the element to its original capacity | Adds capacity above the original |
| Spalling, cracks, corrosion | Extra load, openings, change of use |
| Concrete repair mortars, steel treatment | CFRP, steel plates, jacketing |
Official sites: DDA | Dubai Building Code
What you need to know
- Cause first: repairs fail if the cause stays.
- Tests by a testing lab, read by our engineers.
- Propping may be needed during the works.
- DDA approval before structural repair works.
Documents you will need
- Photos of the damaged areas
- Building and unit details
- As-built drawings, if available
- Any earlier repair reports
How it works
How we handle a concrete repair in a DDA area
1. Inspection
Mapping the damage.
2. Tests
Testing lab.
3. Repair design
And method statement.
4. DDA
Submission.
5. Works
Specialist contractor.
6. Close-out
Supervised.
Questions
Concrete repair questions
Do I need DDA approval for concrete repair?
Structural repairs do. We check your case and tell you if it is structural.
Who tests the concrete?
A testing laboratory. Our engineers choose the tests and read the results.
Can repairs and strengthening be done together?
Yes, often in one design and one submission. See DDA strengthening approval.
Do you carry out the repair?
No. We design and supervise; a specialist contractor carries out the repair.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.