CFRP Strengthening Design and Approval in Dubai

Carbon fibre (CFRP) wraps and strips can add capacity to slabs, beams and columns without rebuilding them. Structural Solutions designs the CFRP strengthening, coordinates the specialist stamp and takes it to approval with Dubai Municipality, DDA or Trakhees CED.

CFRP strengthening uses carbon fibre sheets, strips or wraps bonded to concrete to increase the capacity of slabs, beams and columns. In Dubai it is used for overloaded slabs, new openings, change of use and damaged elements. It needs a design, the strengthening specialist stamp the authority asks for (Dubai Municipality (DM), Dubai Development Authority (DDA) or Trakhees CED) and approval before the works. Structural Solutions designs it, coordinates the stamp and follows the file until the final approval; a specialist contractor installs it.

Used forSlabs, beams, columns
NeedsDesign and specialist stamp
Installed bySpecialist contractor

When

When CFRP strengthening is used

SituationGuide
New opening in a slab or wallstrengthening for new openings
Heavier use or new equipmentslab strengthening approval
Damaged or corroded element after repairconcrete restoration specialist in Dubai
Column needs more capacitycolumn strengthening approval
Beam needs more capacitybeam strengthening approval

Design

What the CFRP design covers

ItemWhat is checked
Existing capacityFrom drawings, survey and testing
Required capacityFor the new loads or the change
CFRP layoutSheets, strips or wraps, layers and anchorage
Surface preparationConcrete repair before bonding
Fire protectionWhere needed

By authority

Specialist stamps by authority

The authority is set by where the plot is. We confirm it before starting.

AuthoritySteel worksConcrete restoration or strengthening
Dubai Municipality (DM)Steel specialist contractor or subcontractor, appointed by the main contractorConcrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp
Dubai Development Authority (DDA)Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approvalStrengthening specialist stamp; see DDA strengthening specialist stamp
Trakhees CEDSteel specialist or approved steel contractor stampConcrete restoration or strengthening specialist stamp

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Assess first: the concrete must be sound.
  • Specialist stamp per authority.
  • Installed by a specialist contractor.
  • We design and follow to final approval.

Documents you will need

  • Existing structural drawings
  • Photos and test reports
  • Reason for strengthening
  • Developer or building management NOC

How it works

How we handle CFRP strengthening

1. Assess

Survey and tests.

2. Design

CFRP layout.

3. Stamp

Specialist coordinated.

4. Approval

Authority.

5. Site

Installation checks.

6. Final approval

We follow it.

Already done

CFRP already installed without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

CFRP strengthening questions

Is CFRP strengthening approved in Dubai?

Yes, with a design and the strengthening specialist stamp the authority asks for. See CFRP strengthening for DDA for DDA.

Can I strengthen a slab with CFRP instead of rebuilding it?

Often yes, after an assessment shows the concrete is sound.

Who designs CFRP strengthening?

Structural Solutions designs it; a specialist contractor installs it.

Which authority approves CFRP strengthening?

Dubai Municipality, DDA or Trakhees CED, depending on where the building is.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions designs CFRP strengthening, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.