Who Can Stamp a Strengthening or Concrete Repair Design for DDA?
Two stamps go on a strengthening design in a DDA area: the consultant who submits the Building Modification, and a separate strengthening specialist stamp. Here is who does what.
DDA accepts submissions from consultants “registered with DDA”, in DDA's own words. For strengthening and repair, DDA also asks for a separate strengthening specialist stamp on the design. The contractor then needs the DDA No Objection before the structural works start. We submit as the consultant and coordinate the specialist stamp.
Who does what
Roles on a DDA strengthening submission
| Role | What they do |
|---|---|
| Consultant | Assesses, designs, submits the Building Modification and answers the DDA comments |
| Strengthening specialist | Stamps the strengthening design; see strengthening specialist stamp |
| Specialist contractor | Carries out the works after the DDA No Objection |
| Testing lab | Tests the concrete; the consultant chooses the tests and reads the results |
| Owner | Gives the NOCs, the title deed and site access |
Official sites: DDA | Dubai Building Code
What you need to know
- DDA wording: consultants “registered with DDA” submit.
- Specialist stamp: separate, on the strengthening design.
- Contractor alone cannot submit the design.
- We coordinate both stamps for you.
Documents you will need
- Location and building
- What needs strengthening and why
- Any drawings or test results
How it works
How we get the design stamped and submitted
1. Tell us
Element and location.
2. Assess
Site and tests.
3. Design
By our engineers.
4. Stamps
Consultant and specialist.
5. Submit
To DDA.
Questions
Stamp questions
Can a contractor stamp the strengthening design?
No. The design is submitted by the consultant and carries the strengthening specialist stamp. The contractor carries out the works after the DDA No Objection.
Is the specialist stamp the same as the consultant stamp?
No. It is a separate stamp on the strengthening design.
Do you coordinate the specialist stamp?
Yes. We coordinate it as part of the submission.
Is this the same for steel works?
Steel works need the approved steel contractor (also called a steel specialist) stamp. See steel specialist stamp for DDA.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.