Slab Restoration and Repair Approval (DDA)
Slabs in car parks, podiums, balconies and wet areas spall, crack and lose steel to corrosion. Slab repairs need a repair design and, in DDA areas, DDA approval with the specialist stamp.
Slab damage shows as spalling at the underside, rust stains and cracks, often below podiums, balconies, bathrooms and car parks. The repair design and method go to DDA with the concrete restoration stamp, and post-tensioned slabs are scanned first.
Damage
Common slab damage
Car parks, podiums, balconies and wet areas in towers and villas.
| Damage | Cause or sign |
|---|---|
| Spalling at the soffit | Bars exposed |
| Rusted bars | Water and salts |
| Cracks | Shrinkage, load or movement |
| Water damage | Podiums, balconies, wet areas |
Investigation
What we investigate
A testing laboratory carries out the tests; our engineers choose the tests and read the results.
| Check | How |
|---|---|
| Underside survey | Hollow and spalled areas |
| Steel bars | Section loss and chlorides |
| Water source | Leaks from above |
| Tendons | Located before breaking out |
Repair
How a slab repair is designed
The DDA route is on the concrete restoration stamp page.
Official sites: DDA | Dubai Building Code
What you need to know
- Cause first: bars exposed.
- Restoration stamp on the repair design.
- Supervised repair works.
- Needs more strength? See slab strengthening.
Documents you will need
- Photos of the slab damage
- Building details
- Earlier reports, if any
How it works
Slab repair, step by step
1. Survey
Underside survey.
2. Tests
Laboratory.
3. Design
Repair and method.
4. DDA
Stamp and approval.
5. Repair
Supervised.
Questions
Slab restoration questions
Do I need DDA approval to repair a slab?
Structural repairs do. We check your case and tell you if the repair is structural.
Is a post-tensioned slab repaired the same way?
No. Tendons are located first; see PT slab repair.
Is the restoration stamp different from the strengthening stamp?
It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.
Related guides
