Strengthening Specialist Stamp for DDA Approval
DDA asks for a separate strengthening specialist stamp on strengthening and repair designs. We coordinate the stamp with the design and the Building Modification submission, so the file goes to DDA complete.
The strengthening specialist stamp is a separate stamp on the strengthening design, in addition to the consultant who submits to DDA. We prepare the design, coordinate the specialist stamp and submit the full package. Contractors and CFRP applicators who need a consultant stamp for their DDA submission can work with us the same way.
What is stamped
What the specialist stamp covers
| Item | Notes |
|---|---|
| Strengthening drawings | Method, extent and details |
| Calculations | Loads before and after strengthening |
| Repair method statement | Sequence, propping and checks |
| Material data | From the contractor or supplier |
Contractors
For CFRP and repair contractors
You need a consultant design and stamp for your DDA submission.
| You send | We do |
|---|---|
| Scope and site photos | Site visit and assessment |
| Your system data sheets | Strengthening design and calculations |
| Client NOCs | Specialist stamp coordinated, submission to DDA |
| Your programme | Supervision and close-out |
Official sites: DDA | Dubai Building Code
What you need to know
- Separate stamp from the submitting consultant.
- Coordinated with the design, not added at the end.
- Contractors do the works, not the stamp.
- Steel works have their own steel specialist stamp.
Documents you will need
- Strengthening scope
- Existing drawings or survey
- Test results, if any
- Contractor system data, if chosen
How it works
How the specialist stamp fits in
1. Scope
What and where.
2. Design
Our engineers.
3. Stamp
Specialist coordinated.
4. Submission
DDA.
5. No Objection
Contractor starts.
Questions
Specialist stamp questions
Is the strengthening specialist stamp required by DDA?
Yes. DDA asks for a separate strengthening specialist stamp on strengthening and repair designs.
Is the concrete restoration stamp a different stamp?
It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp. See concrete restoration stamp.
Can you stamp a design prepared by a contractor?
We review it, revise it where needed and take it through the stamp and submission. See structural peer review.
Is it the same as the steel specialist stamp?
No. Steel works have their own approved steel contractor (also called a steel specialist) stamp. See DDA steel structure approval.
How much does the stamp cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.