DDA · Specialist stamp · Updated November 2026

Concrete and Strengthening Specialist Stamp for DDA Approval

Strengthening a concrete column, beam, slab or foundation in a DDA area needs the specialist stamp on the design before DDA approves it. We design the concrete strengthening, coordinate the specialist stamp and submit the file.

DDA asks for a separate specialist stamp on concrete strengthening and repair designs, on top of the consultant who submits the Building Modification. It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp. We prepare the design and calculations, coordinate the stamp and submit to DDA.

CoversConcrete strengthening and repair
Same stamp asStrengthening specialist stamp
WeDesign, coordinate, submit

Elements

Concrete elements the stamp covers

Methods

Concrete strengthening methods

MethodWhere
Concrete jacketingColumns and beams
CFRP sheets, laminates and wrapsSlabs, beams and columns; see CFRP
Steel plates and jacketsBeams, columns and openings
Underpinning and micro-pilesFoundations

Official sites: DDA | Dubai Building Code

What you need to know

  • One stamp, many names: strengthening, concrete strengthening, restoration.
  • On top of the consultant submission.
  • Contractor starts after the DDA No Objection.
  • Steel works have their own steel specialist stamp.

Documents you will need

  • What needs strengthening and why
  • As-built drawings, if available
  • Test results, if any
  • Developer or building NOC requirements

How it works

How the concrete strengthening stamp is arranged

1. Assess

Site and tests.

2. Design

Concrete strengthening.

3. Stamp

Specialist coordinated.

4. Submit

DDA Building Modification.

5. Works

Supervised.

Questions

Concrete strengthening stamp questions

Is the concrete strengthening stamp different from the strengthening specialist stamp?

It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.

Who submits to DDA?

The consultant, “registered with DDA” in DDA's words, submits the Building Modification with the stamped design.

Can a contractor get the stamp for their own design?

We review the design, revise it where needed and coordinate the stamp. See strengthening design review.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.