Beam Restoration and Repair Approval (DDA)
Beams show spalling at the soffit, rusted bottom bars and cracks long before they fail. Beam repairs need a repair design and, in DDA areas, DDA approval with the specialist stamp.
Beam damage shows first at the soffit: spalling, rust stains along the bottom bars and cracks. Cracks near the supports need an engineer before anything else. The repair design goes to DDA with the concrete restoration stamp.
Damage
Common beam damage
Car park and basement beams, balcony edge beams and beams below wet areas.
| Damage | Cause or sign |
|---|---|
| Spalling at the soffit | Bottom bars exposed |
| Rusted bottom bars | Section loss |
| Shear cracks near supports | Need an engineer check |
| Honeycombing | Poor original concreting |
Investigation
What we investigate
A testing laboratory carries out the tests; our engineers choose the tests and read the results.
| Check | How |
|---|---|
| Crack pattern | Bending, shear or corrosion |
| Bottom bars | Section loss |
| Soffit concrete | Hollow areas mapped |
| Supports | Bearing condition |
Repair
How a beam repair is designed
The DDA route is on the concrete restoration stamp page.
| Part | Notes |
|---|---|
| Propping | Before breaking out |
| Bar treatment or added bars | Where section is lost |
| Concrete repair | Repair mortar or concrete |
| Strengthening if needed | CFRP or steel after the repair |
Official sites: DDA | Dubai Building Code
What you need to know
- Cause first: bottom bars exposed.
- Restoration stamp on the repair design.
- Supervised repair works.
- Needs more strength? See beam strengthening.
Documents you will need
- Photos of the beam damage
- Building details
- Earlier reports, if any
How it works
Beam repair, step by step
1. Survey
Crack pattern.
2. Tests
Laboratory.
3. Design
Repair and method.
4. DDA
Stamp and approval.
5. Repair
Supervised.
Questions
Beam restoration questions
Do I need DDA approval to repair a beam?
Structural repairs do. We check your case and tell you if the repair is structural.
Are cracks in a beam always serious?
Not always. The pattern and width tell us; see crack assessment.
Is the restoration stamp different from the strengthening stamp?
It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.
Related guides
