Our Services: Structural Engineering and Authority Approvals in Dubai

Structural Solutions is an engineering and approvals consultancy in Dubai. We prepare structural calculations and stamped drawings, and we handle developer NOCs and authority permits with DM, DDA, Trakhees, DMCC, RTA and DCD for villas, apartments, offices, shops, restaurants and warehouses.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Engineering and Approvals in One Team

Most projects need both: calculations and drawings that prove the works are safe, and the approvals that allow them. We provide either service on its own, or both together, from the first site check to the completion certificate.

How We Work

01

Your Idea, Photos and Location

02

Site Check and Existing Drawings

03

Structural Calculations and Stamped Drawings

04

Developer or Building Management NOC

05

Authority Permit (DM, DDA, Trakhees or DMCC)

06

Inspection and Completion Certificate

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Engineering Only, or Full Approvals?

If you already have a contractor or architect, we can provide only the structural calculations, reports and stamped drawings. If you need permits, we take the same files through the developer and authority approvals.

What We Work On

Villas

Apartments

Offices and Shops

Restaurants and Cafes

Warehouses

Plot Access

Our Services

Structural Calculations

Stamped calculations for extensions, openings, roofs, mezzanines and new loads.

Steel Structure Calculations

Steel frames, platforms, mezzanines, staircases, connections and base plates.

Aluminium Structure Calculations

Cladding, louvres, shopfronts, balcony enclosures, screens and canopies.

Pergolas, Canopies and Shades

Wind-load and foundation design for pergolas, canopies, car shades and louvred roofs.

Authority Approvals

Building permits and approvals from DM, DDA, Trakhees, DMCC, RTA, DCD and DEWA.

Developer NOCs

Community NOCs from Emaar, Nakheel, DAMAC, Dubai Holding, Meraas and others.

Villa Extensions and Modifications

Extensions, wall removal, pools, lifts, solar panels and mezzanines.

As-Built Drawings and Regularisation

Site surveys, as-built drawings and retrospective approval of existing works.

Fit-Outs, Restaurants and Shops

Office, shop and restaurant fit-out approvals, extensions, DCD and food safety.

Apartment Merging

Structural checks, approvals and the DLD title deed merge for combined apartments.

Plot Access and RTA

Driveways, kerbs and access from the road, with RTA and developer approvals.

Warehouses and Industrial

Mezzanines, racking, crane beams, roof loads and warehouse extensions.

Engineer inspecting villa works for regularisation in Dubai — Structural Solutions

Engineering

Calculations and stamped drawings

Approvals

Developer NOCs and authority permits

Completion

Inspections and certificate

Why Clients Choose Structural Solutions

Engineers In-House

Calculations and stamped drawings prepared by our own structural engineers.

Every Authority

DM, DDA, Trakhees, DMCC, RTA, DCD and DEWA, plus developer NOCs.

Independent Consultant

We work for the owner and check that what is built matches what was approved.

Tell Us About Your Project

Send us the location, photos and your idea. We will tell you which engineering and approvals you need.

Our Services FAQs

Do you only prepare calculations, or also handle approvals?

Both. We can provide structural calculations and drawings on their own, or take them through the developer NOC and authority permit as well.

Which authorities do you work with?

Dubai Municipality, DDA, Trakhees, DMCC through Concordia, RTA, DCD and DEWA, plus developers such as Emaar, Nakheel, DAMAC, Dubai Holding and Meraas.

Are your structural calculations stamped?

Yes. Calculations and drawings are stamped for submission to the developer and authority.

Do you build or install the works?

No. We are an engineering and approvals consultancy. We design, calculate, prepare drawings and handle approvals; your contractor builds the works.

Can you help with works already built without approval?

Yes. We survey the works, prepare as-built drawings and calculations, and apply for retrospective approval.