Engineers who get your works approved.
Structural Solutions is an engineering consultancy in Business Bay, Dubai. We provide structural engineering, drawings and stamped calculations, and manage developer NOCs and authority approvals, from the first design to the completion certificate.
Who we are
One team for engineering and approvals
Owners, tenants and businesses come to us when they want to change a property in Dubai and need it designed safely and approved properly. Our engineers prepare the design, and we take it through the developer and the authority until the works are signed off.
- Engineers in-house: structural calculations and stamped drawings by our own team.
- Every authority: Dubai Municipality, DDA, Trakhees, DMCC via Concordia, RTA and DCD.
- Every major developer: Emaar, Nakheel, DAMAC, Dubai Holding, Meraas, wasl and more.
- Start to finish: site check, design, NOCs, permits, inspections and completion.
How we are different
On your side, from design to sign-off.
We work for the owner, not the builder. That means our advice is about what is safe and what will be approved, not about selling works.
What we do
- Structural engineering and stamped calculations
- Architectural, structural and as-built drawings
- Developer NOCs and authority permits
- Inspections, sign-off and completion certificates
- Structural assessments and third party verification
What we do not do
- Build or carry out construction works
- Supply or install materials
- Fabricate steel or aluminium
- Maintenance contracts
Services
What we handle for you
How we work
Four phases, one responsible team
We review your idea, photos and location, and confirm who approves the works.
Drawings and stamped structural calculations made to what each authority asks for.
Developer NOC and authority permit, submitted and followed up by us.
Inspections, sign-off and the completion certificate.
Who we work with
For owners, tenants and businesses
Have a project in Dubai?
Send us photos and the location. We will tell you which approvals apply and how we can help.
