DDA · Comments · Updated November 2026

DDA Comments on a Strengthening or Repair Submission

Your strengthening or concrete repair file came back from DDA with comments, or it has been waiting without progress. We review the file and the comments, prepare the answers and resubmit.

DDA comments usually ask for information, clarification or changes to the drawings and calculations. We read every comment, check the design and the site, revise what is needed and resubmit. If the consultant on the file has stopped working, we can take over the file.

FirstRead every comment
ThenRevise and resubmit
AlsoTake over the file

Comment types

What comments usually ask for

CommentWhat we do
Missing informationCollect it: drawings, tests, NOCs
CalculationsClarify or revise them
DetailsRevise the drawings
StampsCoordinate the specialist stamp
Method of worksPrepare or update the method statement

Related

If the file is stuck

SituationGuide
Permit stuck with commentsPermit stuck with comments
Consultant not respondingChanging the consultant
Design by othersStrengthening design review

Official sites: DDA | Dubai Building Code

What you need to know

  • Answer every comment in one resubmission.
  • Check the site if the comment is about the existing structure.
  • We can take over from another consultant.
  • No guessing: we read the actual comments.

Documents you will need

  • The DDA comments
  • The submitted drawings and calculations
  • File or application number
  • Photos of the site

How it works

How we close DDA comments

1. Send the comments

And the file.

2. Review

Every comment.

3. Revise

Drawings and calcs.

4. Resubmit

To DDA.

Questions

DDA comments questions

Why did DDA send comments on my strengthening file?

It depends on the file. We read the comments and tell you what each one needs.

Can you answer comments on another consultant's file?

Yes, after we take over the file.

Do comments mean the design is rejected?

Not necessarily. Most comments ask for information or changes before approval.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading