DDA · Restoration stamp · Updated November 2026

Concrete Restoration Stamp for DDA Approval

Concrete restoration and repair of structural elements in a DDA area needs the specialist stamp on the repair design. We inspect, design the repair and the method statement, coordinate the stamp and submit to DDA.

The concrete restoration stamp, also called the concrete repair stamp, is the same strengthening specialist stamp that DDA asks for on strengthening designs. The repair design, method statement and calculations go to DDA through the Building Modification route, and the contractor starts after the DDA No Objection.

Also calledConcrete repair stamp
Same asStrengthening specialist stamp
Before worksDDA No Objection

What is stamped

What the restoration stamp covers

ItemNotes
Damage survey and test resultsA testing laboratory carries out the tests; our engineers choose the tests and read the results.
Repair drawingsAreas, depths and details
Repair method statementPropping, sequence and checks
CalculationsWhere the repair affects the capacity

Where

Restoration by element and area

Official sites: DDA | Dubai Building Code

What you need to know

  • Same stamp as strengthening, different name.
  • Cause first: the repair design deals with it.
  • Tests by a laboratory.
  • Supervised repair works.

Documents you will need

  • Photos of the damage
  • Building and unit details
  • As-built drawings, if available
  • Earlier repair reports, if any

How it works

How the restoration stamp is arranged

1. Survey

Map the damage.

2. Tests

Laboratory.

3. Repair design

And method.

4. Stamp

Specialist.

5. DDA

Submission.

6. Repair

Supervised.

Questions

Concrete restoration stamp questions

Do I need a specialist stamp for concrete repair in a DDA area?

Yes, for structural repairs. It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.

Is cosmetic patching covered?

Patching with no structural effect is assessed case by case. We tell you if your repair is structural.

Who stamps concrete repair for DDA?

The specialist stamp goes on the design and the consultant submits it. See who can stamp a repair design.

Do you carry out the works?

No. We assess, design and supervise; a specialist contractor carries out the works.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading