Question · Concrete restoration · Updated November 2026

Who Can Stamp a Concrete Restoration Design in Dubai?

The authority asked for a specialist stamp on your concrete repair or strengthening design. Here is who stamps it in each authority, and how Structural Solutions gets it done.

A concrete restoration or strengthening design in Dubai needs the consultant design plus a specialist stamp accepted by the authority. Dubai Municipality (DM) requires a concrete restoration specialist stamp where strengthening is involved; Dubai Development Authority (DDA) uses a strengthening specialist stamp; Trakhees CED asks for a concrete restoration or strengthening specialist stamp. Structural Solutions prepares the design, coordinates the specialist stamp and follows the file until the final approval.

DesignConsultant
StampRestoration or strengthening specialist
WeCoordinate to final approval

By authority

Specialist stamps by authority

The authority is set by where the plot is. We confirm it before starting.

AuthoritySteel worksConcrete restoration or strengthening
Dubai Municipality (DM)Steel specialist contractor or subcontractor, appointed by the main contractorConcrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp
Dubai Development Authority (DDA)Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approvalStrengthening specialist stamp; see DDA strengthening specialist stamp
Trakhees CEDSteel specialist or approved steel contractor stampConcrete restoration or strengthening specialist stamp

Who stamps what

Who stamps what on a restoration file

DocumentBy
Assessment and test interpretationOur engineers; tests by a testing laboratory
Repair or strengthening designThe consultant
Specialist stampA restoration or strengthening specialist accepted by the authority
WorksThe contractor

Related

Related guides

TopicGuide
DM concrete restoration stampDM concrete restoration stamp
DDA concrete restoration stampDDA concrete restoration stamp
Who can stamp a strengthening design for DDAwho can stamp a strengthening design for DDA
Concrete restoration hubconcrete restoration specialist in Dubai

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • DM: restoration specialist stamp where strengthening is involved.
  • DDA: strengthening specialist stamp.
  • Trakhees CED: restoration or strengthening specialist stamp.
  • We coordinate the stamp.

Documents you will need

  • Authority comment asking for the stamp
  • Assessment or test reports
  • Existing drawings
  • Photos

How it works

How we get a restoration design stamped

1. Comment

What the authority asks.

2. Design

Prepared or checked.

3. Stamp

Specialist coordinated.

4. Resubmit

And answer comments.

5. Final approval

We follow it.

Questions

Restoration stamp questions

Who can stamp a concrete restoration design in Dubai?

A restoration or strengthening specialist accepted by the authority, on top of the consultant design. Structural Solutions coordinates it.

Does Dubai Municipality need a restoration specialist stamp?

Yes, where strengthening is involved.

Does Trakhees ask for a specialist stamp on strengthening?

Yes. Trakhees CED asks for a concrete restoration or strengthening specialist stamp.

Do I need a specialist for concrete repair in Dubai?

Where the authority needs approval for the repair or strengthening, yes. We confirm it for your case.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions designs concrete restoration and strengthening and coordinates the specialist stamp until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading