DDA · Podium · Updated November 2026

Podium Slab Repair and Restoration Approval (DDA)

Podium slabs carry gardens, pools and plant above the car park, and water damage shows on the underside. We assess the slab, design the structural repair and take it through DDA with the specialist stamp.

Podium repairs in DDA areas follow the Building Modification route with the concrete restoration stamp, after the building management NOC. We design the structural repair; the waterproofing above is a separate specialist scope that the repair design takes into account.

AuthorityDDA
StampSpecialist, on the repair
WorksSpecialist contractor

Problems

Common problems

ProblemWhat we check
Leaks into the car park belowConcrete and steel condition
Spalling at the soffitDepth and cause
Planters and pools on the podiumLoads and water
Movement jointsCondition and leaks
CracksCrack assessment

Route

The route

StepWho
Developer, master community or building NOCEmaar, DAMAC, Dubai Holding or the building management, depending on the location
Building Modification designDDA, submitted by the consultant
Strengthening specialist stampOn the strengthening design, coordinated by us; see strengthening specialist stamp
DDA No Objection for the contractorBefore the structural works start
Works and site supervisionSpecialist contractor, supervised by the consultant
Inspection and close-outDDA

Official sites: DDA | Dubai Building Code

What you need to know

  • Cause first: water, salts or loads.
  • Tests by a laboratory.
  • Specialist stamp on the repair design.
  • Propping where needed.

Documents you will need

  • Photos of the damage
  • Building details
  • As-built drawings, if available
  • Building management requirements

How it works

How we handle the repair

1. Survey

Map the damage.

2. Tests

Laboratory.

3. Design

Repair and method.

4. Stamp

Specialist.

5. DDA

Submission.

6. Repair

Supervised.

Questions

Questions

Do you do the waterproofing?

No. We design the structural repair; waterproofing is a separate specialist scope.

Can heavier planters be added to the podium?

Only after a load check. See slab strengthening.

Do you carry out the works?

No. We assess, design and supervise; a specialist contractor carries out the works.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.