Car Park Slab Repair and Restoration Approval (DDA)
Car park slabs in towers and podiums take water, salts and vehicle loads for years. Spalling, rusted steel bars and cracks need a repair design, and in DDA areas the repair goes to DDA with the specialist stamp.
Car park slab repairs in DDA areas start with the building management NOC, then a survey and laboratory tests, then the repair design and method statement with the concrete restoration stamp, then the DDA submission. Post-tensioned car park slabs need a tendon check before any breaking out.
Problems
Common problems
| Problem | What we check |
|---|---|
| Spalling at soffits and ramps | Depth and the steel behind it |
| Rusted steel bars | Section loss and chlorides |
| Cracks | Pattern and cause |
| Post-tensioned slabs | PT car park slabs |
| Column bases | Column restoration |
Route
The route
| Step | Who |
|---|---|
| Developer, master community or building NOC | Emaar, DAMAC, Dubai Holding or the building management, depending on the location |
| Building Modification design | DDA, submitted by the consultant |
| Strengthening specialist stamp | On the strengthening design, coordinated by us; see strengthening specialist stamp |
| DDA No Objection for the contractor | Before the structural works start |
| Works and site supervision | Specialist contractor, supervised by the consultant |
| Inspection and close-out | DDA |
Official sites: DDA | Dubai Building Code
What you need to know
- Cause first: water, salts or loads.
- Tests by a laboratory.
- Specialist stamp on the repair design.
- Propping where needed.
Documents you will need
- Photos of the damage
- Building details
- As-built drawings, if available
- Building management requirements
How it works
How we handle the repair
1. Survey
Map the damage.
2. Tests
Laboratory.
3. Design
Repair and method.
4. Stamp
Specialist.
5. DDA
Submission.
6. Repair
Supervised.
Questions
Questions
Can the car park stay open during repairs?
Often in zones, with propping and barriers. We plan it with the building management.
Do post-tensioned slabs need special care?
Yes. Tendons are located before any breaking out.
Do you carry out the works?
No. We assess, design and supervise; a specialist contractor carries out the works.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
