Which Communities Are in Al Aryam?
Al Aryam covers Mira and Mira Oasis. Homes in both follow the same route: the Al Aryam NOC, then DDA for major works.
The short answer
Al Aryam covers Mira and Mira Oasis. The approval route is the same in both: the Al Aryam NOC for every modification, then DDA for major works. Both communities are under DDA, not Dubai Municipality. Contractors in Mira Oasis get the gate pass through PMO.
Mira and Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Same route: Mira and Mira Oasis follow the same steps.
- Not Dubai Municipality: The authority here is DDA.
- Pools: The pool environmental NOC is the exception, from the Dubai Municipality Environment Department.
- Mira Oasis: Contractors get the gate pass through PMO.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Who issues the NOC? →Dubai Development Authority (DDA)
Approves major works, including changes to partitions, after the Al Aryam NOC.
Do I need DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Is Mira under Al Aryam?
Yes.
Is Mira Oasis under Al Aryam?
Yes.
Is the route the same in both?
Yes.
Which authority applies?
DDA.
Related guides
