Mira · Mira Oasis · Al Aryam

Mira and Mira Oasis Car Shade NOC

A car shade in Mira or Mira Oasis needs the Al Aryam NOC. We review your design and advise if DDA is needed.

The short answer

Adding a car shade in Mira or Mira Oasis needs the Al Aryam NOC. Whether DDA is also needed depends on the works, so we review your design and advise. We prepare the drawings and handle the application.

NeedsAl Aryam NOC
DDAWe review and advise
DrawingsWe prepare them

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Location: We check it against your plot.
  • Fixings: We check them before you order.
  • Supplier: Send us the design.
  • Contractors: A gate pass is needed in Mira Oasis.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Do I need a NOC for a car shade?

Yes.

Do I need DDA?

We review your design and advise.

Is it the same in Mira Oasis?

Yes.

What should I send?

Photos and the design.

Related guides

Keep reading