Who Issues the Al Aryam NOC?

Al Aryam issues the NOC directly. We get in touch with its engineering team and obtain the NOC for you. We are an independent consultancy, not part of Al Aryam.

The short answer

The Al Aryam NOC is issued directly by Al Aryam, and its engineering team reviews the application. We get in touch with that team on your behalf and obtain the NOC. We are an independent engineering consultancy and not part of Al Aryam. DDA does not issue this NOC: it comes in afterwards, for major works.

Issued byAl Aryam directly
Reviewed byIts engineering team
WeGet in touch and obtain it

Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Before DDA: The NOC comes first.
  • Same for both: Mira and Mira Oasis follow the same route.
  • Not us: We work for the owner, and Al Aryam makes the decision.
  • PMO: The PMO gate pass is separate from the NOC.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Al Aryam NOC guide →
🏛️

Dubai Development Authority (DDA)

Issues the permit for major works, after the Al Aryam NOC.

Is Al Aryam under DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Who issues the Al Aryam NOC?

Al Aryam, directly.

Does DDA issue it?

No. DDA issues the permit for major works, after the NOC.

Are you Al Aryam?

No, we are an independent consultancy.

Can you deal with Al Aryam for me?

Yes, we get in touch with the engineering team and obtain the NOC.