Mira and Mira Oasis Wall Removal NOC

Removing walls in Mira or Mira Oasis needs the Al Aryam NOC and DDA. We check the walls first, including any shared with neighbours.

The short answer

Removing or opening walls in Mira or Mira Oasis needs the Al Aryam NOC, and changes involving partitions also need DDA. Many homes are townhouses that share walls with neighbours, so we check the walls first. Our engineers design any support needed with stamped calculations, and we handle the submissions.

NeedsAl Aryam NOC and DDA
CheckWalls and structure
DesignStamped calculations

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Shared walls: Designed to protect both homes.
  • Partitions: Changes need DDA as well.
  • Plans: From the master developer, or we obtain them on your behalf.
  • Beams: Shown in the drawings and calculations.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Can I remove a wall?

It depends on the wall. We check it first.

Do partitions need DDA?

Yes, with the Al Aryam NOC.

How do I know if a wall is structural?

We check the plans and the wall on site.

Is it the same in Mira Oasis?

Yes.