Mira and Mira Oasis Swimming Pool NOC
A pool in Mira or Mira Oasis needs the Al Aryam NOC, DDA approval and the pool environmental NOC. We prepare the drawings and handle them.
The short answer
A swimming pool in Mira or Mira Oasis needs the Al Aryam NOC, DDA approval, and the pool environmental NOC from the Dubai Municipality Environment Department. Many homes are townhouses, so we check the garden and shared walls first. We prepare the drawings and calculations, and handle the submissions.
Mira and Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Pool fence: A fence is required around the pool for safety. To remove it, an undertaking letter from the landlord (the property owner) is required.
- Garden: We measure it first.
- Shared walls: The pool must not affect them.
- Backwash: Pressure-breaking manhole, gully trap, then the villa manhole.
- Contractors: A gate pass is needed in Mira Oasis.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Who issues the NOC? →Dubai Development Authority (DDA)
Approves major works, including changes to partitions, after the Al Aryam NOC.
Do I need DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Is a fence needed around the pool?
A fence is required around the pool for safety. To remove it, an undertaking letter from the landlord (the property owner) is required.
What approvals does a pool need?
The Al Aryam NOC, DDA and the pool environmental NOC.
Who issues the environmental NOC?
The Dubai Municipality Environment Department.
Is my garden big enough?
We check it for you.
Is it the same in Mira Oasis?
Yes.