Al Aryam NOC Documents Required
The Al Aryam NOC usually needs the scope of works, proposed drawings and owner documents. Other documents may be requested, depending on the team reviewing it.
The short answer
For an Al Aryam NOC, you need the scope of works, the proposed drawings and the owner documents. Other documents may be requested, depending on the team reviewing the application, so the list can differ from one job to another. We prepare the drawings and put the package together. For existing drawings, the master developer can give you the as-built drawings, or we obtain them on your behalf.
Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What each document is for
- Scope of works: A clear description of what will change.
- Proposed drawings: We prepare these for you.
- As-built drawings: From the master developer, or we obtain them on your behalf.
- Other documents: Depends on the team reviewing the application.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Al Aryam NOC guide →Dubai Development Authority (DDA)
Issues the permit for major works, after the Al Aryam NOC.
Is Al Aryam under DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What we handle
- Al Aryam NOC
- Mira and Mira Oasis modifications
- PMO gate pass
What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
What documents does the Al Aryam NOC need?
The scope of works, proposed drawings and owner documents. Other documents may be requested.
Why might they ask for more?
It depends on the team reviewing the application.
Where do I get my villa drawings?
The master developer can give them, or we obtain them on your behalf.
Do you prepare the drawings?
Yes, we prepare the proposed drawings.