From our guides
Guides on this topic
Civil Defence Approval for Telecom Equipment Rooms in DubaiDubai Civil Defence approval for telecom equipment rooms: room layout, fire and life safety drawings, floor check for…Read the guide →Telecom Tower Structural Inspection and Audit in DubaiTelecom tower structural inspection in Dubai: corrosion, bolts, welds, galvanising, base and equipment, with a rated…Read the guide →Telecom Tower Mapping and As-Built Survey in DubaiTelecom tower mapping in Dubai: we survey the structure, antennas, dishes and mounts and produce as-built drawings…Read the guide →Roof Penetrations and Waterproofing for Rooftop Telecom TowersRooftop telecom tower bases in Dubai designed with few roof penetrations: raised plinths, upstands and details the…Read the guide →Telecom Equipment on a Post-Tensioned Slab Roof in DubaiRooftop telecom equipment on a post-tensioned slab in Dubai: confirm PT, locate the tendons, place bases clear of them…Read the guide →RTA Approval for Roadside Telecom Poles and Small CellsRTA approval for roadside telecom poles and small cells in Dubai: we prepare the pole, base and foundation calculations…Read the guide →Small Cell Pole Structural Design in DubaiSmall cell pole design in Dubai to TIA-222: pole section, top mount, cable door, base plate, anchor bolts and…Read the guide →Smart Pole and Lamp Post Antenna Loading in DubaiLamp post and smart pole antenna loading in Dubai: we check the pole, base plate, anchor bolts and foundation for the…Read the guide →Street-Level 5G Pole Foundation Design in Dubai5G street pole foundation design in Dubai: pad, block or pile sized for wind overturning, soil and buried services,…Read the guide →Indoor DAS Bracket and Support Calculations in DubaiIndoor DAS support calculations in Dubai: antenna brackets, cable tray hangers, cabinets and racks, with slab, wall and…Read the guide →
