Telecom · Post-tensioned roof · Updated November 2026

Telecom Equipment on a Post-Tensioned Slab Roof in Dubai

Many Dubai towers have post-tensioned slabs. Drilling into one without knowing where the tendons run can cut a cable that holds the slab up.

A post-tensioned slab has steel tendons under high tension inside the concrete. Drilling or coring into a tendon can damage the slab badly, so rooftop telecom equipment on a post-tensioned roof needs more care than on an ordinary slab. First we confirm whether the roof is post-tensioned, from the drawings or by site checks. Then the tendons are located and marked before any fixing, and we place the bases away from them, use shallow fixings or a ballasted frame, and check the slab for the new load.

RiskCutting a tendon
Before fixingTendons located
OptionsPlaced bases or ballast

How we handle it

Steps on a post-tensioned roof

StepWhat we do
ConfirmIs the slab post-tensioned? how to tell if a slab is post-tensioned
LocateTendons located and marked on site
PlaceBases set clear of the tendons
FixShallow fixings or a ballasted frame
CheckSlab capacity for the new load

Related

More on post-tensioned slabs

TopicGuide
Post-tensioned slab designpost-tensioned slabs
Roof penetrationsroof penetrations
Can the roof take the towerwhether the roof can support a tower

Official sites: Dubai Municipality | DDA

What you need to know

  • Tendons under tension.
  • Locate before drilling.
  • Bases placed clear.
  • Slab checked.

Documents you will need

  • Building structural drawings, if any
  • Post-tensioning shop drawings, if any
  • Roof photos
  • Equipment list and layout

How it works

Post-tensioned roof steps

1. Drawings

Review.

2. Confirm

PT or not.

3. Locate

Tendons.

4. Layout

Bases.

5. Check

Slab load.

6. Report

Stamped.

Questions

Post-tensioned roofs: questions

Can I drill into a post-tensioned roof slab?

Only after the tendons are located and marked, and only where the design allows.

How do I know if the roof is post-tensioned?

See how to tell if a slab is post-tensioned.

Is a ballasted frame better on a post-tensioned roof?

It avoids drilling, if the roof can take the weight.

Who locates the tendons?

A specialist scanning contractor on site; we mark the safe zones on the drawings.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions checks post-tensioned roofs for telecom equipment in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.