RTA Approval for Roadside Telecom Poles and Small Cells
Small cells and 5G poles are moving to the street. Anything placed beside a road in Dubai needs the RTA on board.
Roadside telecom poles and small cells need RTA approval, because they sit beside the road and its services. The TDRA step for the telecom installation also applies. For the RTA submission we prepare the pole structural calculations and drawings: the pole, the antenna and radio loads, the base and the foundation, and the position of the pole in relation to the road. Where antennas go on an existing lamp post or smart pole, we check that pole for the added load.
What the submission needs
Our part of the RTA submission
| Item | What we prepare |
|---|---|
| Pole design | small cell pole design |
| Existing lamp or smart pole | smart pole antenna loading |
| Foundation | street pole foundations |
| Wind load | telecom tower wind load calculations |
Other approvals
Who else is involved
| Body | Role |
|---|---|
| RTA | Roadside poles and small cells |
| TDRA | The telecom installation |
| Authority for the area | Building permit for towers on plots: who approves telecom towers |
What you need to know
- RTA for roadside poles.
- TDRA for telecom.
- Stamped calculations.
- Existing poles checked.
Documents you will need
- Pole location plan
- Equipment list
- Pole supplier details, if any
- Existing pole details, if reused
How it works
Roadside pole steps
1. Brief
Location.
2. Loads
Equipment, wind.
3. Pole
Design.
4. Foundation
Design.
5. Drawings
Stamped.
6. Submission
RTA.
Questions
Roadside poles: questions
Do roadside telecom poles need RTA approval?
Yes.
Does a small cell on a lamp post need approval?
Yes, from RTA, and the pole has to be checked for the extra load.
What do you prepare?
The structural calculations and drawings for the pole, its base and foundation.
Is TDRA also involved?
Yes, for the telecom installation.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions prepares pole calculations for RTA roadside telecom submissions in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
