Roof Penetrations and Waterproofing for Rooftop Telecom Towers
Every bolt or plinth on a roof is a possible leak. A rooftop tower has to be fixed firmly without leaving the building below wet.
When a rooftop tower or equipment frame is fixed to the slab, the fixings pass through the roof finishes and the waterproofing. We design the support so the number of penetrations stays low: raised concrete or steel plinths with upstands, fixings grouped on a few bases, or ballasted frames where the roof allows. We detail each base so the waterproofing can be turned up and sealed around it by the roofing contractor, and we check the slab for the new load and for any post-tensioned tendons before anything is drilled.
Support options
How the tower meets the roof
| Option | Effect on waterproofing |
|---|---|
| Concrete plinth | Raised base, membrane turned up its sides |
| Steel stub on a plinth | Few fixings, sealed at the top of the upstand |
| Ballasted frame | No drilling, if the roof can take the weight |
| Fixing to beams | Fewer, larger bases at the strongest points |
Checks
What we check before any drilling
| Check | Guide |
|---|---|
| Slab and beams for the new load | whether the roof can support a tower |
| Post-tensioned tendons | equipment on a post-tensioned roof |
| Frame and fixings | a steel frame for rooftop equipment |
Official sites: Dubai Municipality | DDA
What you need to know
- Few penetrations.
- Raised bases.
- Sealable details.
- Slab checked first.
Documents you will need
- Roof drawings or photos
- Equipment list and layout
- Building structural drawings, if any
- Roof finish and waterproofing details, if known
How it works
Rooftop base steps
1. Brief
Equipment.
2. Roof
Survey.
3. Slab
Check.
4. Bases
Design.
5. Details
Upstands.
6. Report
Stamped.
Questions
Roof penetrations: questions
Will a rooftop tower cause leaks?
Not if the bases are raised and detailed so the waterproofing can be sealed around them.
Can equipment sit on the roof without drilling?
Sometimes, on a ballasted frame, if the roof can take the weight.
Who reinstates the waterproofing?
The roofing contractor, to our base details.
What if the slab is post-tensioned?
Tendons are located before any drilling. See equipment on a post-tensioned roof.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs rooftop telecom tower bases and penetration details in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.