Rooftop Telecom Tower Structural Design in Dubai

A rooftop tower is two structures: the mast itself and the building that carries it. Both have to be checked before the permit.

For a rooftop telecom tower we design the mast or tower to TIA-222 and check the building under it: the roof slab, the beams and columns that take the load down, and the connection between the two. Rooftop masts are fixed to the structure or sit on a ballasted frame, and each option puts different loads on the roof. If the roof cannot take the load, we design a steel frame that spreads it to the columns. You need the building owner or management NOC, then the building permit from Dubai Municipality, DDA, Trakhees or DSO for the area, and the TDRA step.

ChecksMast and building
CodeTIA-222
NeedsBuilding owner NOC

What we check

Mast and building

ItemWhat we look at
Mast or towerWind, equipment weight, deflection, members and bolts
ConnectionBase plates, anchors, fixings into the slab or beams
Roof slabCapacity under the new loads
Beams and columnsLoad path down the building
WaterproofingFixing details that keep the roof sealed

Mounting

Fixed or ballasted

OptionWhat it means for the roof
Fixed to the structureAnchors into beams or columns; loads go straight into the frame
Ballasted frameWeight holds it down; the slab carries the extra weight
Steel grillageSpreads the load to the columns when the slab is not enough

Approvals

Who approves a telecom structure

The building permit comes from the authority for the area. Other approvals depend on the site.

ApprovalWhen it applies
Building permit: Dubai Municipality, DDA, Trakhees or DSOAlways, from the authority for the area
TDRATelecom approval for the installation
Dubai Civil Aviation Authority (DCAA)Height clearance near airports and flight paths
RTAPoles and small cells at the roadside
Building owner or management NOCAny tower on an existing building

Official sites: Dubai Municipality | DDA | TDRA

What you need to know

  • Two checks: mast and building.
  • Fixed or ballasted.
  • Owner NOC first.
  • Permit from the area authority.

Documents you will need

  • Building structural drawings or as-builts
  • Roof photos
  • Equipment list and layout
  • Building owner or management NOC

How it works

Rooftop tower design steps

1. Drawings

Building as-builts.

2. Survey

Roof on site.

3. Design

Mast, TIA-222.

4. Check

Roof and frame.

5. Report

Stamped.

6. Permit

Area authority.

Questions

Rooftop towers: questions

Can any roof take a telecom tower?

Not always. We check the slab, beams and columns first, and design a frame to spread the load if needed.

What if I have no building drawings?

We survey the roof and the structure on site and work from what we find.

Is a ballasted mast easier to approve?

It avoids drilling the roof, but the slab must carry the extra weight. We check both options.

Who gives the building permit?

Dubai Municipality, DDA, Trakhees or DSO, depending on where the building is.

How is wind load worked out?

See how wind load on a tower is calculated.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions designs rooftop telecom towers and checks the building that carries them. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.