How Do You Calculate Wind Load on a Telecom Tower?

Wind is the main load on a telecom tower. The tower itself is light; the wind on the tower and its antennas sets the size of the members and the foundation.

Wind load on a telecom tower is worked out in four steps. First, the design wind speed for the site. Second, the wind pressure at each height, which grows with height and depends on the terrain and the surroundings. Third, the area the wind acts on: the tower members, the antennas, dishes and cables, each with its own shape factor. Fourth, the force on each part, from the pressure, the area and the shape factor, applied up the height of the tower. We do this to TIA-222, the standard for antenna-supporting structures, with Dubai wind data.

CodeTIA-222
Grows withHeight
IncludesAntennas and cables

The steps

From wind speed to force

StepWhat it means
1. Design wind speedThe wind speed for the site, from the wind data
2. Pressure with heightHigher up means more pressure; terrain and surroundings change it
3. Wind areaTower members, antennas, dishes, cables
4. Shape factorsRound, flat and lattice parts catch wind differently
5. ForcesPressure x area x shape factor, applied up the tower

Why it matters

What the wind load decides

ItemEffect
Members and boltsTheir size and strength
Foundation or roof fixingOverturning and uplift
Antenna alignmentSway and twist at the top
Added equipmentEvery new antenna adds wind area

Official sites: Dubai Building Code

What you need to know

  • Wind is the main load.
  • Pressure grows with height.
  • Antennas add wind area.
  • TIA-222 method.

Documents you will need

  • Site location
  • Tower height and type
  • Equipment list with sizes
  • Surroundings: open ground or buildings

How it works

Wind load in practice

1. Wind speed

For the site.

2. Pressure

At each height.

3. Area

Tower and equipment.

4. Shape

Factors.

5. Forces

Up the tower.

6. Design

Members, foundation.

Questions

Wind load on towers: questions

What is the main load on a telecom tower?

Wind, on the tower and on its antennas, dishes and cables.

Which code is used?

TIA-222, with Dubai wind data. See also the wind code used in Dubai.

Why does adding antennas matter?

Each antenna adds wind area at the top, where the pressure is highest.

Is it the same as a billboard?

The principle is the same, with a different standard and shapes. See wind load on a billboard.

Can you calculate it for my tower?

Yes. See telecom tower structural calculations.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.