Telecom · For contractors · Updated November 2026

For Telecom Contractors: Stamped Structural Calculations on Every Site

Telecom contractors install for operators across many sites. What they need from a structural consultant is a dependable partner who turns each site around and issues stamped calculations.

We work with telecom contractors as their structural consultant across Dubai. For each site you send the location, photos and equipment list; we check the tower, mast or bracket, and the building where it is a rooftop site, to TIA-222. You receive a stamped calculation report and fixing details for the permit and for the operator, working on sites for operators such as e& and du. Where a site needs a survey, we visit. Where it fails, we design the strengthening or a different layout so the job can go ahead.

ForTelecom contractors
Each siteStamped report
If it failsFix designed

How we work

Working with contractors

StepWhat happens
You sendLocation, photos, equipment list
We reviewDrawings or site visit
We checkTower or mount and building
We issueStamped report and fixing details
If it failsStrengthening or new layout

Site types

What we cover

Official sites: Dubai Municipality | DDA

What you need to know

  • Repeat partner.
  • Stamped every site.
  • Survey when needed.
  • Fixes designed.

Documents you will need

  • Site list with locations
  • Photos of each site
  • Equipment lists
  • Operator specification

How it works

Contractor workflow

1. Send

Site details.

2. Review

Drawings.

3. Survey

If needed.

4. Check

TIA-222.

5. Fix

If it fails.

6. Issue

Stamped.

Questions

For contractors: questions

Do you work with telecom subcontractors?

Yes, as their structural consultant across Dubai.

Do you work on e& and du sites?

We prepare calculations for contractors working on sites for operators such as e& and du.

What if a site fails the check?

We design the strengthening or a different layout.

How do you price?

See what the calculations cost.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions works with telecom contractors as their structural consultant. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading