Billboard Structural Calculations in Dubai

Billboards are large structures where wind governs the design. We prepare engineer-stamped calculations for the frame, connections and foundation.

The short answer

A billboard needs stamped structural calculations for the wind load, its own weight, the frame members, the connections and anchors, and the structure it stands on, whether a foundation, a roof slab, a parapet or a wall. The calculations go with the sign approval: RTA when the billboard is in, over or affecting the road reserve, otherwise the authority for the area.

GovernsWind load
ChecksFrame, fixings, foundation
ApprovalRTA if in the road reserve

What you need to know

  • Wind load: The main design load for large signs.
  • Frame: Steel members and connections.
  • Anchors: Base plates and bolts.
  • Support: Foundation, roof slab, parapet or wall checked.
  • Approval: RTA in the road reserve; area authority otherwise.

Documents you will need

  • Affection plan showing the plot and the road reserve
  • Site layout showing where the works enter the road reserve
  • Drawings of the works: plans, sections and details
  • Traffic management or diversion layout where the road or footpath is affected
  • Stamped structural calculations where something is built or lifted
  • Contractor details

By type of work

Which RTA approval for which work

We confirm which RTA approval your works need.

WorkApproval routeGuides
Excavation or utility crossing
RTA ROW NOC
Before digging in the road reserve.Utility crossings
Trial trenches
RTA ROW NOC
To locate existing services.Trial trenches
Hoarding in the road reserve
RTA ROW NOC
Not needed if fully inside the plot.Hoarding
Crane or truck on the road
RTA permit
Plus road or lane closure.Crane permit
Closing a footpath or lane
RTA closure permit
With a traffic layout.Footpath closure
Driveway or kerb cut
RTA access permit
For the plot access.Driveway NOC

How it works

How the RTA NOC works

1. Site check

Are the works inside the road reserve? Checked against the affection plan.

2. Drawings

Layout, sections and details of the works in the road reserve.

3. Calculations

Stamped structural calculations where needed.

4. Traffic layout

Diversion, lane or footpath closure layout if the road is affected.

5. RTA NOC

Application to RTA; comments answered.

6. Works

Only inside the approved area, after the NOC.

7. Reinstatement

The road, kerb or footpath is reinstated as approved.

Who does what

Who is involved

🛣️

RTA (Roads and Transport Authority)

Issues the right-of-way (ROW) NOC for works inside the public road reserve.

What is a ROW NOC? →
🚧

Traffic management

Where a lane, road or footpath is affected, the diversion or closure layout is approved too.

Lane closures →
📐

Structural Solutions

Prepares the drawings, layouts and stamped calculations for the RTA application.

Talk to our engineers →

Why RTA applications get returned

  • Works shown outside the approved area
  • No traffic management layout where lanes or footpaths are affected
  • Drawings that do not match the site
  • Missing structural calculations
  • Works started before the NOC

Questions

Questions owners and contractors ask

Does a billboard need structural calculations?

Yes, stamped calculations for wind, frame, fixings and support.

Does RTA approve billboards?

When they are in, over or affecting the road reserve.

Can a billboard go on a roof?

The roof slab is checked for the loads first.