Structural Specialist Stamps for DM, DDA and Trakhees
Steel works and concrete restoration or strengthening need a specialist stamp on top of the consultant design. Structural Solutions is the consultant that prepares the design, coordinates the specialist stamp and follows the file until the final approval with Dubai Municipality (DM), the Dubai Development Authority (DDA) and Trakhees CED.
Two kinds of specialist stamp come up on structural works in Dubai: the steel specialist (approved steel contractor) stamp for steel works, and the concrete restoration or strengthening specialist stamp for repair and strengthening. Dubai Municipality (DM) asks for a steel specialist contractor or subcontractor appointed by the main contractor, and a concrete restoration specialist stamp where strengthening is involved. Dubai Development Authority (DDA) and Trakhees CED ask for both types too. Structural Solutions prepares the calculations and design, coordinates the stamps and follows the file until the final approval.
By authority
Specialist stamps by authority
The authority is set by where the plot is. We confirm it before starting.
| Authority | Steel works | Concrete restoration or strengthening |
|---|---|---|
| Dubai Municipality (DM) | Steel specialist contractor or subcontractor, appointed by the main contractor | Concrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp |
| Dubai Development Authority (DDA) | Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approval | Strengthening specialist stamp; see DDA strengthening specialist stamp |
| Trakhees CED | Steel specialist or approved steel contractor stamp | Concrete restoration or strengthening specialist stamp |
Steel
Steel specialist guides
| Question | Guide |
|---|---|
| Calculations and stamp from one team | steel calculations and stamp from one team |
| DM steel specialist | steel specialist for Dubai Municipality projects |
| Who can be the DM steel specialist | who can be the steel specialist on a DM project |
| Steel calculations for Trakhees | who can stamp steel calculations for Trakhees |
| Steel calculations for DDA | who can stamp steel calculations for DDA |
| Steel mezzanine | steel mezzanine calculations by authority |
Concrete
Concrete restoration and strengthening guides
| Question | Guide |
|---|---|
| Concrete restoration specialist | concrete restoration specialist in Dubai |
| Who can stamp a restoration design | who can stamp a concrete restoration design |
| CFRP strengthening | CFRP strengthening design and approval |
| DDA structural strengthening | DDA structural strengthening approval |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Consultant: Structural Solutions prepares the design.
- Specialist stamp: coordinated by us.
- All three authorities: DM, DDA, Trakhees CED.
- Until final approval: we follow the file.
Documents you will need
- Drawings or authority comments
- Photos of the works or damage
- Contractor details
- Developer, landlord or building management NOC
How it works
How we handle specialist stamps
1. Send
Drawings or comments.
2. Route
Authority and stamps.
3. Design
Calculations.
4. Stamp
Coordinated.
5. Submit
And comments.
6. Final approval
We follow it.
Questions
Specialist stamp questions
Who provides steel specialist and concrete restoration stamps in Dubai?
Specialist contractors accepted by the authority provide the stamps. Structural Solutions prepares the design as consultant and coordinates the stamps until the final approval.
Does Structural Solutions hold the specialist stamps?
No. We are the consultant: we prepare the design, coordinate the specialist stamps and follow the file.
Which authorities ask for specialist stamps?
Dubai Municipality (DM), the Dubai Development Authority (DDA) and Trakhees CED.
Can one team handle the design and the specialist stamp?
Yes. You deal with Structural Solutions; we coordinate the specialist.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares structural designs and coordinates steel specialist and concrete restoration or strengthening specialist stamps for DM, DDA and Trakhees CED until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.