Who Can Stamp Steel Calculations for DDA?
Steel works in Dubai Development Authority (DDA) areas such as Dubai Hills, Arabian Ranches, Business Bay, TECOM zones and Dubai Industrial City need DDA approval. Here is who stamps what, and how Structural Solutions takes the file to approval.
For Dubai Development Authority (DDA) approval, the consultant prepares and stamps the steel calculations and drawings, and the steel needs a steel specialist stamp recognised by DDA. Contractors working on DDA permits must be registered with DDA. Structural Solutions prepares the calculations, coordinates the steel specialist stamp and follows the file with DDA until the final approval.
Who stamps what
Who stamps what for DDA
| Document | Stamped by |
|---|---|
| Steel structural calculations | The consultant |
| Structural drawings | The consultant |
| Steel design and fabrication drawings | A steel specialist recognised by DDA; see steel specialist stamp for DDA approval |
| Design review | Where DDA asks for it; see DDA steel design review |
Areas
DDA areas and steel works
| Area | Typical steel works |
|---|---|
| Dubai Hills, Arabian Ranches, The Valley | Pergolas, canopies, staircases, villa extensions |
| Business Bay and Dubai Creek Harbour | Fit-out mezzanines, rooftop structures |
| TECOM zones and Dubai Industrial City | Mezzanines, warehouses, sheds, platforms |
Official sites: DDA
What you need to know
- Two stamps: consultant plus steel specialist.
- Contractors must be registered with DDA.
- Developer NOC first in master communities.
- We coordinate until final approval.
Documents you will need
- Developer NOC where needed
- Steel drawings or concept
- Site photos
- Contractor details
How it works
How we get steel calculations stamped for DDA
1. Brief
Works and plot.
2. Calculations
Prepared by us.
3. Steel stamp
Coordinated.
4. DDA
Submission and comments.
5. Final approval
We follow it.
Questions
DDA steel stamp questions
Who can stamp steel calculations for DDA?
The consultant stamps the calculations and drawings, and the steel needs a steel specialist stamp recognised by DDA.
Does DDA need a steel specialist stamp?
Yes, for steel works. See steel specialist stamp for DDA approval.
Must the contractor be registered with DDA?
Yes. Contractors working on DDA permits must be registered with DDA.
Can Structural Solutions do the calculations and the stamp?
We prepare the calculations and coordinate the steel specialist stamp, then follow the file until the final approval.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares steel calculations for DDA, coordinates the steel specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
