Concrete restoration · Strengthening · Updated November 2026

Concrete Restoration Specialist in Dubai: Repair, Strengthening and Approval

Spalling concrete, exposed rusting steel, cracked slabs or columns that need strengthening? Structural Solutions assesses the structure, designs the repair or strengthening, coordinates the specialist stamp and follows the file until the final approval.

Concrete restoration in Dubai starts with an assessment and testing, then a repair or strengthening design, then the authority approval. Dubai Municipality (DM) requires a concrete restoration specialist stamp where strengthening is involved, Dubai Development Authority (DDA) has a strengthening specialist stamp, and Trakhees CED asks for a concrete restoration or strengthening specialist stamp. Structural Solutions designs the repair, coordinates the specialist stamp and follows the file as consultant until the final approval; a contractor carries out the works.

We designRepair and strengthening
StampRestoration or strengthening specialist
WorksBy the contractor

Problems

Concrete problems we assess and design for

ProblemGuide
Spalling and exposed rusting steelis my balcony or slab safe
Cracksstructural crack assessment
Weak or overloaded slabslab strengthening approval
Damaged columns or beamscolumn strengthening approval and beam strengthening approval
New openings in walls or slabsstrengthening for new openings
Warehouse slab and framewarehouse strengthening

Methods

Repair and strengthening methods we design

The contractor carries out the works to our design.

MethodUsed for
Concrete repairSpalled and damaged concrete
Concrete jacketingColumns and beams that need more capacity
Steel plate bonding or jacketingBeams, slabs and columns
CFRP strengtheningSlabs, beams and columns; see CFRP strengthening design and approval
Underpinning and micro-pilesFoundations

By authority

Specialist stamps by authority

The authority is set by where the plot is. We confirm it before starting.

AuthoritySteel worksConcrete restoration or strengthening
Dubai Municipality (DM)Steel specialist contractor or subcontractor, appointed by the main contractorConcrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp
Dubai Development Authority (DDA)Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approvalStrengthening specialist stamp; see DDA strengthening specialist stamp
Trakhees CEDSteel specialist or approved steel contractor stampConcrete restoration or strengthening specialist stamp

Before design

Assessment and testing first

A testing laboratory carries out the tests; our engineers choose the tests and read the results.

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Assess first: survey and testing.
  • Specialist stamp: needed by DM (with strengthening), DDA and Trakhees.
  • We coordinate until final approval.
  • Contractor does the works.

Documents you will need

  • Photos of the damage
  • Existing structural drawings, if available
  • Building or unit details
  • Any previous reports

How it works

How we handle concrete restoration

1. Visit

See the damage.

2. Testing

Laboratory tests chosen by us.

3. Design

Repair or strengthening.

4. Stamp

Specialist stamp coordinated.

5. Approval

Authority submission.

6. Site

Inspections to final approval.

Already done

Repairs already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Concrete restoration questions

Who is a concrete restoration specialist in Dubai?

A specialist whose stamp the authority accepts for restoration or strengthening design. Structural Solutions designs the works and coordinates that stamp.

Does Dubai Municipality require a concrete restoration specialist?

Yes, where strengthening is involved, Dubai Municipality requires a concrete restoration specialist stamp.

Who approves structural strengthening in Trakhees or DDA?

Trakhees CED in Trakhees areas and the Dubai Development Authority in DDA areas, each with its specialist stamp.

How do I repair concrete spalling in my building?

Get it assessed first. We find the cause, design the repair and take it to approval; a contractor carries out the works.

What tests are needed before concrete restoration?

It depends on the case. A testing laboratory carries out the tests; our engineers choose the tests and read the results. See concrete testing of an existing building.

Can I strengthen a slab instead of rebuilding it?

Often yes, after assessment. See slab strengthening approval.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses damaged concrete, designs the repair or strengthening, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading