Question · Dubai Municipality · Updated November 2026

Who Can I Assign as the Steel Specialist for My Dubai Municipality Project?

Dubai Municipality (DM) asked for a steel specialist on your permit and you are not sure who qualifies or who appoints them. Here is the answer, and how Structural Solutions handles it with you.

On a Dubai Municipality (DM) permit, the steel specialist is a specialist steel contractor or subcontractor approved for steel works, and it is appointed by the main contractor on the permit. Structural Solutions, as your consultant, prepares the steel calculations and drawings, coordinates the steel specialist stamp with the main contractor and follows the file until the final approval.

Steel specialistSpecialist steel contractor or subcontractor
Appointed byThe main contractor
Coordinated byStructural Solutions, as consultant

Roles

Who does what for the steel works on a DM permit

PartyRole
OwnerAppoints the consultant and the main contractor
Main contractorAppoints the steel specialist contractor or subcontractor
Steel specialistStamps the steel and fabricates and installs it
Structural Solutions (consultant)Steel calculations and drawings, coordination of the steel stamp, submission and follow-up until final approval
Dubai MunicipalityReviews, approves and inspects

Situations

Common situations

SituationWhat to do
Main contractor has no steel specialistThe main contractor appoints one as a subcontractor; we coordinate the stamp
Permit on hold for the steel specialistSend us the DM comment; we coordinate the appointment and the stamp
Steel fabricator is not approved for steel worksAn approved specialist steel contractor or subcontractor is needed
Calculations missingWe prepare them; see steel structure calculations

Official sites: Dubai Municipality

What you need to know

  • Main contractor appoints the steel specialist.
  • Specialist contractor or subcontractor: both are possible.
  • We coordinate the stamp and follow until final approval.
  • Calculations come from the consultant.

Documents you will need

  • DM permit details and comments
  • Steel drawings or concept
  • Main contractor details
  • Steel specialist details, if appointed

How it works

How we sort out the steel specialist on a DM permit

1. Comment

Send the DM request.

2. Calculations

We prepare or check them.

3. Appointment

Main contractor appoints the specialist.

4. Stamp

We coordinate it.

5. Submit

Until final approval.

Questions

Steel specialist on a DM permit: questions

Who can I assign as the steel specialist for my DM project?

A specialist steel contractor or subcontractor approved for steel works, appointed by the main contractor on the permit.

Who appoints the steel specialist on a DM permit?

The main contractor.

Can the steel specialist be a subcontractor?

Yes. It can be a specialist steel contractor or a subcontractor of the main contractor.

What does Structural Solutions do?

We prepare the steel calculations and drawings, coordinate the steel specialist stamp and follow the file until the final approval. See steel specialist for Dubai Municipality projects.

Is a steel specialist the same as an approved steel contractor?

Yes. Both names are used for the same role.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions coordinates the steel specialist on Dubai Municipality permits and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.