Steel Specialist for Dubai Municipality Projects
Steel works on a Dubai Municipality (DM) building permit need a steel specialist as well as the consultant calculations. Structural Solutions prepares the calculations and drawings, coordinates the steel specialist with your main contractor and follows the file until the final approval.
For steel works on a Dubai Municipality (DM) permit, the main contractor appoints a specialist steel contractor or subcontractor as the steel specialist, who stamps the steel. The consultant prepares and stamps the structural calculations and drawings. Structural Solutions does the consultant side, coordinates the steel specialist stamp and follows the file through review and inspections until the final approval.
Which works
DM steel works that usually need a steel specialist
| Works | Guide |
|---|---|
| Steel mezzanine | steel mezzanine calculations by authority |
| Steel canopy, shade or pergola | Pergola structural calculations |
| Steel staircase | External steel staircase |
| Steel frame villa extension | Steel frame villa extension |
| Warehouse or shed in Al Quoz, Al Qusais or Ras Al Khor | Al Quoz steel structure calculations |
| Steel roof structure | Steel roof structure |
Process
How the steel specialist fits into the DM permit
| Step | What happens |
|---|---|
| 1. Design | We prepare the steel calculations and drawings; see steel connection design |
| 2. Appointment | The main contractor appoints the steel specialist contractor or subcontractor |
| 3. Stamp | We coordinate the steel specialist stamp on the steel drawings |
| 4. Submission | We submit to Dubai Municipality and answer the comments |
| 5. Site | Shop drawings checked against our design; inspections |
| 6. Final approval | We follow the file until the final approval |
Questions
Questions owners ask about the DM steel specialist
| Question | Answer |
|---|---|
| Who can be the steel specialist? | who can be the steel specialist on a DM project |
| Who stamps what? | who can stamp steel drawings |
| Calculations and stamp together? | steel calculations and stamp from one team |
| Other authorities? | structural specialist stamps for DM, DDA and Trakhees |
Official sites: Dubai Municipality
What you need to know
- Main contractor appoints the steel specialist.
- Two stamps: consultant calculations and the steel specialist.
- We coordinate until the final approval.
- Fabrication and installation by the steel contractor.
Documents you will need
- Title deed or tenancy contract with landlord NOC
- Concept or architectural drawings
- Main contractor details
- Site photos
How it works
How we handle steel specialist works for DM
1. Brief
Works and location.
2. Design
Calculations and drawings.
3. Specialist
Appointed by the main contractor.
4. Stamp
Coordinated by us.
5. DM
Submission and comments.
6. Final approval
We follow it through.
Already done
Steel already built without a DM permit?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
DM steel specialist questions
Why does Dubai Municipality ask for a steel specialist?
Steel works need a specialist steel contractor to stamp the steel, in addition to the consultant calculations.
Who appoints the steel specialist on a DM permit?
The main contractor, as a specialist steel contractor or subcontractor.
Does Structural Solutions hold the steel specialist stamp?
No. We prepare the calculations and drawings and coordinate the steel specialist stamp as your consultant.
Can you follow the file until approval?
Yes. We follow it through review and inspections until the final approval.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares the steel calculations, coordinates the steel specialist stamp and follows Dubai Municipality steel permits until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.