Steel Mezzanine Calculations for DM, DDA and Trakhees
Adding a steel mezzanine to a warehouse, shop, office or villa? The calculations, the steel stamp and the approval route depend on the authority. Structural Solutions prepares the calculations, coordinates the steel stamp and takes it to approval.
Every steel mezzanine in Dubai needs approval before it is built: the landlord, building management or developer NOC, then the authority for the area (Dubai Municipality (DM), Dubai Development Authority (DDA) or Trakhees CED) with stamped structural calculations, a steel specialist stamp on the steel and Dubai Civil Defence (DCD) approval. A mezzanine adds floor area. Structural Solutions checks the existing slab, designs the mezzanine, coordinates the steel stamp and follows the file until the final approval.
By authority
Steel mezzanine route by authority
| Authority | Typical areas | Steel stamp |
|---|---|---|
| Dubai Municipality (DM) | Al Quoz, Al Qusais, Ras Al Khor, Dubai Investment Park | Steel specialist appointed by the main contractor |
| Dubai Development Authority (DDA) | Dubai Industrial City, TECOM zones, Business Bay | Steel specialist recognised by DDA |
| Trakhees CED | JAFZA, Nakheel communities | Steel specialist or approved steel contractor |
Design
What the mezzanine calculations check
| Item | What is checked |
|---|---|
| Existing slab | Can it take the column loads? Base plates and anchors |
| Beams and deck | Floor loads for the use: storage, office, retail |
| Columns and bracing | Stability and connections; see steel connection design |
| Stairs and handrails | Access and edge protection |
| Fire safety | DCD requirements |
By use
Mezzanine guides by type of property
| Property | Guide |
|---|---|
| Warehouse | steel mezzanine in a warehouse |
| Shop or showroom | mezzanine in a shop or showroom |
| Villa | villa mezzanine calculations |
| JAFZA | Trakhees CED mezzanine approval |
| Already built without approval | unapproved mezzanine in a warehouse |
| Civil Defence | does a mezzanine need Civil Defence approval |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Approval first: never build before the permit.
- Floor area: a mezzanine adds it.
- DCD approval is needed.
- Slab check: before design.
Documents you will need
- Landlord, building management or developer NOC
- Floor plan and photos of the unit
- Existing structural drawings, if available
- Intended use and loads
How it works
How we get a steel mezzanine approved
1. Brief
Use and size.
2. Slab check
Existing structure.
3. Design
Calculations and drawings.
4. Steel stamp
Coordinated.
5. Approvals
Authority and DCD.
6. Final approval
After inspection.
Already done
Mezzanine already built?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Steel mezzanine questions
Do I need a steel specialist for a mezzanine in Trakhees or DDA?
Yes. Steel mezzanines need a steel specialist stamp in Trakhees CED, DDA and Dubai Municipality areas.
Do I need structural calculations for a steel mezzanine?
Yes. Stamped calculations and drawings are needed, with a check of the slab it sits on.
Does a mezzanine need Civil Defence approval?
Yes, DCD approval is needed.
Does a mezzanine count as floor area?
Yes. A mezzanine adds floor area.
Can Structural Solutions handle the whole mezzanine approval?
Yes. We design it, coordinate the steel stamp and follow the file until the final approval.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions designs steel mezzanines, coordinates the steel specialist stamp and takes them to approval with DM, DDA or Trakhees CED. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.