Question · Trakhees CED · Updated November 2026

Who Can Stamp Steel Calculations for Trakhees?

Steel works in Trakhees areas such as JAFZA, Palm Jumeirah, Jumeirah Park, Al Furjan and JVC go to Trakhees CED for approval. Here is who stamps what, and how Structural Solutions gets both stamps on the file.

For Trakhees CED approval, the steel calculations and drawings are prepared and stamped by the consultant, and Trakhees also asks for a steel specialist or approved steel contractor stamp on the steel. Structural Solutions prepares the steel calculations as your consultant, coordinates the steel specialist stamp and follows the file with Trakhees CED until the final approval.

CalculationsConsultant
Steel stampSteel specialist or approved steel contractor
AuthorityTrakhees CED

Who stamps what

Who stamps what for Trakhees CED

DocumentStamped by
Steel structural calculationsThe consultant
Structural drawingsThe consultant
Steel design and fabrication drawingsA steel specialist or approved steel contractor accepted by Trakhees
Fire safetyDubai Civil Defence (DCD) where the works need it

Areas

Trakhees areas and steel works

AreaTypical steel worksGuide
JAFZAMezzanines, warehouse extensions, sheds, racking platformsJAFZA steel structure calculations
Palm Jumeirah, Jumeirah Park, Al FurjanPergolas, canopies, staircases, steel frame extensionsTrakhees approvals
JVC and Jebel Ali VillageVilla and townhouse steel worksTrakhees approvals

Related

Related Trakhees steel questions

QuestionGuide
Does Trakhees accept calculations from any engineer?does Trakhees accept calculations from any engineer
Who can stamp calculations for JAFZA?who can stamp calculations for JAFZA
Mezzanine in a Trakhees areaTrakhees CED mezzanine approval
Approved steel contractorapproved steel contractor

Official sites: Trakhees

What you need to know

  • Two stamps: consultant plus steel specialist.
  • Trakhees CED approves building and structural works.
  • DCD where fire safety applies.
  • We coordinate until final approval.

Documents you will need

  • Developer or landlord NOC (Nakheel, JAFZA)
  • Steel drawings or concept
  • Site photos
  • Contractor details

How it works

How we get steel calculations stamped for Trakhees

1. Brief

Works and plot.

2. Calculations

Prepared by us.

3. Steel stamp

Coordinated.

4. Trakhees CED

Submission and comments.

5. Final approval

We follow it.

Questions

Trakhees steel stamp questions

Who can stamp steel calculations for Trakhees?

The consultant stamps the calculations and drawings, and Trakhees also asks for a steel specialist or approved steel contractor stamp on the steel.

Does Trakhees ask for a steel specialist stamp?

Yes. Steel works need a steel specialist or approved steel contractor stamp in addition to the consultant calculations.

Can Structural Solutions do both?

We prepare the calculations and coordinate the steel specialist stamp, then follow the file until the final approval. See steel calculations and stamp from one team.

Is JAFZA approved by Trakhees?

Yes. JAFZA building and structural works are approved by Trakhees CED.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares steel calculations for Trakhees CED, coordinates the steel specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.