Do I Need a Specialist for Concrete Repair in Dubai?
Cracks, spalling or exposed steel in your building, villa or car park. Do you need a specialist, and who? Here is how it works across Dubai Municipality (DM), the Dubai Development Authority (DDA) and Trakhees CED.
For concrete repair in Dubai you need an engineer to assess the damage and design the repair, and a specialist contractor to carry it out. Where strengthening is involved, Dubai Municipality (DM), Dubai Development Authority (DDA) and Trakhees CED ask for a concrete restoration or strengthening specialist stamp. Structural Solutions assesses the structure, prepares the repair design, coordinates the specialist stamp and follows the file until the final approval.
By damage
What to do by type of damage
| Damage | First step |
|---|---|
| Hairline cracks in plaster | Usually not structural; we check |
| Cracks in beams, columns or slabs | Assessment; see structural crack assessment |
| Spalling and rusting steel | Repair design; see concrete spalling repair |
| Balcony or slab in doubt | See is my balcony or slab safe |
| Tower-wide damage | See tower concrete restoration for owners associations |
By authority
Specialist stamps by authority
The authority is set by where the plot is. We confirm it before starting.
| Authority | Steel works | Concrete restoration or strengthening |
|---|---|---|
| Dubai Municipality (DM) | Steel specialist contractor or subcontractor, appointed by the main contractor | Concrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp |
| Dubai Development Authority (DDA) | Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approval | Strengthening specialist stamp; see DDA strengthening specialist stamp |
| Trakhees CED | Steel specialist or approved steel contractor stamp | Concrete restoration or strengthening specialist stamp |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Engineer first: before any repair.
- Specialist contractor for the works.
- Strengthening: specialist stamp.
- We follow until final approval.
Documents you will need
- Photos of the damage
- Location and building type
- Existing drawings, if any
- Previous reports
How it works
How we handle concrete repair
1. Photos
Send them to us.
2. Visit
Condition survey.
3. Tests
By a laboratory.
4. Design
Repair method.
5. Approval
Where needed.
6. Works
Supervised.
Questions
Concrete repair: questions
Do I need a specialist for concrete repair in Dubai?
Yes: an engineer to assess and design, and a specialist contractor to repair. Strengthening also needs a specialist stamp.
Can a general maintenance company repair spalling?
Structural repair should follow an engineer design and be done by a specialist contractor.
Does every repair need authority approval?
Not every repair. Strengthening and structural changes do. We confirm the route after the assessment.
Do you carry out the repair?
No. We assess, design and supervise; a specialist contractor carries out the works.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions assesses concrete damage, designs the repair, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
