Structural assessment

Is my balcony or slab safe to use?

If you see wide cracks, sagging, exposed or rusting steel, or concrete breaking off, stop putting heavy loads on it and get an engineer to assess it. We inspect and report; the repairs are done by a contractor.

Balconies and slabs can be weakened by corrosion of the reinforcement, water getting in, overloading or past changes. Signs to act on include cracks across the slab, visible sagging, rust stains, spalling concrete or loose railings. An assessment confirms whether it is safe and what repair is needed.

Warning signsCracks, sagging, rust, spalling
Do nowAvoid heavy loads, get it assessed
ThenReport and contractor repairs

What you need to know

  • Cracks: Especially across the slab or at the support.
  • Sagging: Visible deflection.
  • Corrosion: Rust stains or exposed steel.
  • Overloading: Jacuzzis, planters or storage on balconies.

Documents you will need

  • Photos of the balcony or slab
  • Unit or villa plans
  • What is placed on it

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Inspection
Structural Solutions
Slab, supports and reinforcement checked.—
Report
Structural Solutions
Safety findings and repair advice.—
Repairs
Contractor
Done to the recommendations, with approvals where needed.—

Questions

Related questions

Can I put a jacuzzi on my balcony?

Only if a check confirms the slab can carry it.

What causes balcony damage?

Corrosion, water, overloading or past changes.

Do repairs need approval?

Structural repairs may need the developer or authority.

Do you repair the cracks?

No. We assess and report as independent engineers; the repairs are done by a contractor, following our recommendations.

What does Structural Solutions do?

We assess the slab or balcony and give a stamped report.

Related guides

Keep reading