When works are finished in Mira or Mira Oasis, final inspections and the completion certificate close the job. We check the works first.

The short answer

When approved works in Mira or Mira Oasis are finished, final inspections and the completion certificate close the job. We check the works against the approved drawings first. Any differences are corrected, or the drawings updated, before inspection. An owner letter is required.

Final stepInspection and certificate
CheckAgainst the approved drawings
NeededOwner letter

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Built as approved: Differences are the usual cause of problems.
  • Deposit: Any deposit comes back after clearance.
  • Older works: We survey them and advise.
  • Selling: Keep the certificate with your papers.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

What is the completion certificate?

It confirms the works are finished as approved.

Do you handle it?

Yes.

What if the works differ?

They are corrected, or the drawings are updated.

Is it the same in Mira Oasis?

Yes.