Mira · Mira Oasis · Al Aryam

Al Aryam Painting NOC: Repainting in Mira and Mira Oasis

Repainting the outside of a home in Mira or Mira Oasis needs the Al Aryam NOC. Al Aryam usually requires the existing colour and provides the colour code.

The short answer

Repainting the outside of a home in Mira or Mira Oasis needs the Al Aryam NOC, and Al Aryam usually requires the existing colour and provides the colour code. Very minor works depend on our review, and we advise if DDA is needed. Send us photos and your scope, and we handle the application.

NeedsAl Aryam NOC
ColourUsually the existing colour
DDAWe review and advise

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Colour code: Al Aryam usually provides it.
  • New colour: Tell us, and we will raise it with the team.
  • Contractors: A gate pass is needed in Mira Oasis.
  • Inside: Interior works need the NOC too.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Do I need a NOC to repaint?

Yes, in Mira and Mira Oasis.

Can I change the colour?

Al Aryam usually requires the existing colour.

Do I need DDA?

We review your job and advise.

What is the NOC fee?

AED 2,100 for minor works and AED 3,150 for major works.

Related guides

Keep reading