Do I Need a DDA Permit After the Al Aryam NOC?
Usually yes for major works, including changes to partitions. Very minor works depend on our review, and we advise if DDA is needed.
It depends on the works. Changes involving partitions, extensions and structural work need the Al Aryam NOC and DDA. Very minor works depend on our review: we advise if DDA is needed, and they can sometimes go only through the master developer. Every modification still needs the Al Aryam NOC first. The NOC fee is AED 2,100 for minor works and AED 3,150 for major works. Send us your scope, and we will review it and advise.
Fees
Al Aryam NOC fees
Fees depend on the type of work. Al Aryam confirms the amount for your application, and DDA fees are separate.
| Type of work | Al Aryam NOC fee |
|---|---|
| Minor works | AED 2,100 |
| Major works | AED 3,150 |
Mira and Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Partitions: Changes involving partitions need DDA.
- Extensions: Major works, so DDA applies.
- Structural changes: Major works, so DDA applies.
- Authority: Mira and Mira Oasis are under DDA, not Dubai Municipality.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Who issues the NOC? →Dubai Development Authority (DDA)
Approves major works, including changes to partitions, after the Al Aryam NOC.
Do I need DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Do all works need DDA?
Not always. Major works do, and very minor works depend on our review.
Do partition changes need DDA?
Yes, they need the Al Aryam NOC and DDA.
Can minor works skip DDA?
Sometimes they go only through the master developer. We review and advise.
Which comes first?
The Al Aryam NOC.
Related guides
