Al Aryam Unauthorised Works: What to Do
Works built in Mira or Mira Oasis without the Al Aryam NOC? We survey what was built, check the structure and advise on the route, subject to approval.
If works in Mira or Mira Oasis were built without the Al Aryam NOC or DDA approval, we survey and draw what was built, check the structure, and advise on the route. Any application is subject to review and approval, and some works may need to change. Unapproved works can hold up a sale and new approvals, so it is better to deal with them early.
Mira and Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Stop first: Pause any ongoing works.
- Structure: We check it before anything else.
- Earlier owners: Their works also need checking.
- New works: Older works can hold up new approvals.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Who issues the NOC? →Dubai Development Authority (DDA)
Approves major works, including changes to partitions, after the Al Aryam NOC.
Do I need DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Can unauthorised works be approved?
It depends on the works and the review. We advise after a survey.
What do you need from me?
Photos and any papers you have.
Will this affect a sale?
It can hold one up.
Do I need to stop works?
Yes, pause until you know what is needed.
Related guides
