Mira · Mira Oasis · Al Aryam

Al Aryam NOC Rejected? What to Do

If your Al Aryam NOC came back with comments, start with what the reviewing team said. We review the comments, revise the package and follow up.

If your Al Aryam NOC for Mira or Mira Oasis was rejected or came back with comments, start with what the reviewing team said. The reason is often in the drawings, the scope of works or a missing document. Send us the comments and what you submitted. We review them, revise the package, and get in touch with the Al Aryam engineering team.

First stepRead the comments
OftenDrawings or documents
WeRevise and follow up

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Scope: Make sure it is clear and matches the drawings.
  • Documents: The team may ask for more.
  • Take-over: We can take over an application in progress.
  • DDA: Major works go to DDA after the NOC.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Why was my NOC rejected?

The comments give the reason.

Can I resubmit?

Yes, after dealing with the comments.

Can you take over?

Yes, send us what you submitted.

Who decides?

The Al Aryam team reviewing it.

Related guides

Keep reading