Do I Need an Al Aryam NOC?
Yes. Every modification to a home in Mira or Mira Oasis needs the Al Aryam NOC, including interior works.
Yes, every modification to a home in Mira or Mira Oasis needs the Al Aryam NOC, including interior works, extensions, pools, pergolas, car shades and wall changes. Changes involving partitions, extensions and structural work need the Al Aryam NOC and DDA. Very minor works depend on our review: we advise if DDA is needed, and they can sometimes go only through the master developer. The NOC fee is AED 2,100 for minor works and AED 3,150 for major works.
Fees
Al Aryam NOC fees
Fees depend on the type of work. Al Aryam confirms the amount for your application, and DDA fees are separate.
| Type of work | Al Aryam NOC fee |
|---|---|
| Minor works | AED 2,100 |
| Major works | AED 3,150 |
Mira and Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Inside the home: Interior works need the NOC too.
- Outside: Pergolas, shades and pools need it as well.
- After buying: Check earlier works had approval.
- Start with: Your scope of works.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Who issues the NOC? →Dubai Development Authority (DDA)
Approves major works, including changes to partitions, after the Al Aryam NOC.
Do I need DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Do small works need the NOC?
Yes, every modification does.
Do interior works need it?
Yes.
Do I also need DDA?
For major works, including partition changes. We advise on very minor works.
How do I get it?
We get in touch with the Al Aryam engineering team and obtain it for you.
Related guides
